1) leaching test

淋浸试验
1.
Discuss the result of coal refuse leaching test in Shanxi;

山西煤矸石淋浸试验结果分析讨论
2) leaching and soaking experiments

淋滤和浸泡试验
3) leaching test

淋溶试验
1.
The leaching test have shown that the adsorption of the soil to F -,As is very powerful.

以太原二电厂粉煤灰场为例,通过淋溶试验来模拟大气降水对粉煤灰的淋溶过程以及淋溶液对土壤和浅层地下水水质的影响,说明其影响因素主要取决于排灰场土壤类型及灰水污染物的种类和浓度。
2.
The leaching tests simulating the natural raining were used to analyze the pollution made by coal gangue to the ground water along the coal gangue embankment of highway under construcyion.
利用淋溶试验,模拟天然降雨,分析煤矸石路堤填筑过程中给高速公路沿线地下水造成的污染,获得了大量真实可靠的数据,得出了煤矸石淋溶液中无机盐是是造成高速公路沿线地下水污染的主要原因。
4) leaching test

淋滤试验
1.
Soil column leaching test is a means to study the protective capacity of strata in the aeration zone.
土柱淋滤试验是研究包气带地层防护能力的一种手段,通过对氟化物的淋滤试验研究,了解其土质对氟污染物的吸附与转化的能力,进而推测地面污水对地下潜水的影响。
5) leaching experiment

淋溶试验
1.
The formation of leaching solution of soda-making waste is studied by static soaking and leaching experiments and the relationship between soda-making waste and chloride increasing in karst water is also studied.
本文简要介绍了豫北某地较为丰富的岩溶水资源及其氯化物升高的趋势,通过对制碱废渣的静溶和淋溶试验,分析了碱渣淋滤液的产生过程,同时分析了碱渣堆放场与该市岩溶水中氯离子浓度升高的关系,这将对渣场以后的废渣处理及周围的环境质量评价有极其重要的意义。
2.
Changes of humic substances and their complexed copper during composting of chicken manure with different extractants of H2O,NaOH and NaOH-Na4P2O7 was studied,and leaching experiment was conducted to investigate the dynamics of copper leaching and its relationship to humic substances complexed copper(HS-Cu).
采用H2O、NaOH以及NaOH-Na4P2O7混合液3种浸提剂对不同腐解期鸡粪中的腐殖质结合态铜(HS-Cu)进行提取,在研究腐殖质碳和铜变化的基础上,通过粪肥淋溶试验,研究了铜淋失量变化以及与腐殖质结合态铜的关系。
6) Raining test

淋雨试验
1.
Raining test is the arti- ficial simulation environmental test technology.

淋雨试验方法是一种人工环境试验方法。
2.
Combining the parametric design of the most universal finite element analysis (FEA) software ANSYS with the artificial raining test facility, which is to checkout rainproof and leak-proof function of the automobile, a simulation system that has a certain theoretical value and practical value was established.
将应用最为普遍的有限元分析软件ANSYS参数化设计与汽车防雨密封性检测设备——人工淋雨试验装置的设计相结合,做出了一套具有一定的理论和实用价值的仿真系统。
3.
This article introduced the design and calculation of the artificial raining test facility—the device to check-out rainproof and leak-proof function of the automobile, elaborated guarantees the current capacity of each spraying nozzle even energy conversion balance and the main points of design.
介绍了汽车防雨密封性检测设备——人工淋雨试验装置的设计与计算,阐述了保证每个喷嘴流量均匀的能量转换平衡关系和设计要点。
补充资料:死淋浸
1.见"死临侵"。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条