说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 装配成本评价
1)  Assembly Cost Evaluation
装配成本评价
2)  assembly evaluation
装配评价
3)  cost appraisal
成本评价
1.
A general Technology Screening Mechanism(TSM) for the cleaner production of metallurgical industry was presented and a cost appraisal model for economic consideration was described in the TSM.
描述了钢铁工业清洁生产的一种技术筛选机制,并详细提出了其中用于经济评价的成本评价模型,还给出了成本评价模型用于电弧炉炼钢中的一个案例分析。
4)  appraisement cost
评价成本
5)  assembly cost
装配成本
1.
Analyses detailedly a major factor on affecting assembling cost estimation precision in technology design stage,proposes the estimating model and system of raising estimating precision based on product structure tree on assembly cost,verifies that the estimating model is feasible by the example of product fleetness quoted price system of freight train.
详细分析了影响技术设计阶段装配成本估算精度的主要因素,提出了提高估算精度的基于产品结构树的装配成本估算模型和系统,通过铁路货车产品快速报价系统实例验证了这种估算模型的可行性。
2.
The estimating model of raising estimating precision was proposed based on the product structure tree on assembly cost through analysing the assemble cost in the technology design stage,the importance of estimating cost was verified in technology design stage by the example.
通过分析产品技术设计阶段的装配成本,提出了提高估算精度的基于产品结构树的装配成本估算模型,通过实例验证了在产品技术设计阶段对成本估算的重要性。
6)  total cost assessment
总成本评价
补充资料:地下水水资源评价(见水资源评价)


地下水水资源评价(见水资源评价)


  d ixiashui shuiziyuan Ping】ia地下水水资源评价见水资源评价。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条