1) heat exchangers of the reactor-outflow & the feed of butane splitter

脱丁烷塔进料换热器
2) Debutanizer
[de'bjutənaizə]

脱丁烷塔
1.
The operation pressure of debutanizer was unstable since a light hydrocarbon recovery unit had been put into use.
某轻烃回收装置自投用以来,脱丁烷塔操作压力一直不稳定。
3) deisobutanizer

脱异丁烷塔
4) Combined feed exchanger

进料换热器
5) feed/effluent exchanger

进料/出料换热器
6) debutanizator

混烃脱丁烷塔
1.
In view of the situation that the quality of butane and liquefied gas produced in the mixed hydrocarbon treatment system can not meet specifications simultaneously, the separation effectiveness of the debutanizator in the system was simulated and checked through analyses of various actual mixed hydrocarbon feed composition and comparison between actual feed and designed feed.
根据目前混烃处理系统生产的C_5和液化气两种产品的质量无法同时满足要求的情况,通过对实际的各种混烃进料组成及实际进料与设计进料对比分析,模拟核算混烃脱丁烷塔的分离效果。
补充资料:料敌塔
1.即河北省定县开元寺塔。宋为抵抗辽金,借以瞭望敌情,故名。料,用同"瞭"。宋真宗咸平四年(1001年)始建,宋仁宗至和二年(1055年)完成。为八角形砖塔,十一层,高八十余米,是国家重点保护文物。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条