说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 延迟固井
1)  delayed cementing
延迟固井
1.
Restoring damaged old wells by using delayed cementing technique of φ101.6mm casing;
用φ101.6mm套管延迟固井技术修复残坏老井
2.
6 casing delayed cementing technology was carried out.
6无接箍套管、套管扶正器,并应用了延迟固井工艺,确保了φ101。
2)  shut-in lag
延迟关井
1.
Obtaining the rate of delay shut-in period is the key factor of shut-in lag modification technology.
油气井的延迟关井现象严重歪曲了试井解释结果。
3)  retardation of curing
延迟固化
4)  Delayed fixation
延迟固定
5)  inherent delay
固有延迟
1.
An analysis is given of the linear “AND-OR” gates transient characteristics in the multi elementlogical circuits (DYL for short), and its inherent delay is also estimated through calculation.
对多元逻辑电路(简称DYL)线性“与或”门的瞬态特性进行了分析,并对它的固有延迟进行了估算。
6)  fixed delay
固定延迟
补充资料:固井


固井
sealing of drop-shaft bottom to rock

  gUJ,ng固井(sealing of drop一shaft bottom to roek)在竖井沉井法掘进中将沉井井筒永久固定的技术。当沉井下沉达到设计深度后,为防止井筒继续下沉或出现位移,需采取加强井壁和土帮的固定措施,以隔离井筒与井外含水层的水力联系,这是沉井施工的最后一道工序。固井采取的主要措施是联接套井与沉井的上口,井筒壁后注浆以增加侧面阻力,砌筑沉井基座以增加正面阻力,最终使井筒保持稳固。 在固井之前,若刃脚坐落的基岩上面无隔水粘土层,则需构筑封底止水垫,以防止井内排水后,发生涌砂冒泥或突水事故。封底后,首先要清除套井与沉井之间的泥浆,然后在其中浇灌片石混凝土,同时将沉井上口的钢筋与套井锁口的钢筋焊接好,并浇灌混凝土,使沉井与套井连成整体。最后,排除井内积水,进行壁后注浆。一般采用分段下行、分段内上行式注浆方法。当采用泥浆护壁减阻时,要先注清水,把泥浆置换出来后,再注水泥浆。井底筑有止水垫时,要进行工作面预注浆。待浆液凝固后,破除封底止水垫,在基岩中砌筑沉井基座。待基座砌好,沉井施工结束,即转入井筒普通法掘进。 (石达民)
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条