1) bulging height

起拱高度
1.
A regression equation indicating the relation between the fabric bulging height and weight, and between the fabric weight and compactness is derived from the test and analysis of the bulging height of heavy_weight silk fabrics conducted by self_made bulge tester, thus offering data support to the design of proper weight and compactness of the fabric for bulge proofness.
采用自制的起拱测试装置 ,对重磅真丝绸的起拱高度进行了测试和分析 ,得出了重磅真丝绸的起拱高度与织物重量 ,织物重量与织物紧度间的回归关系式 ,为重磅真丝绸抗起拱性的适合重量和紧度设计提供了数据支持。
2) residual bagging height

起拱残留高度
1.
Prediction method for fabric residual bagging height

织物起拱残留高度的预测方法
3) reversed arch

起拱度
1.
Influence on reversed arch of creep in prestressed concrete beam is analyzed by combining with project under construction Jiepaiya bridge in the reach from Gucheng to Wudangshan of Xiangfan-Shiyan highway.
结合襄樊 -十堰高速公路谷城至武当山段在建的界牌垭高架桥 ,分析混凝土徐变对预应力混凝土桥梁起拱度的影响 ,并提出控制桥梁过度起拱的设计方法和施工措施 。
4) adjustable arch

起拱度调整
1.
Based on an extensive comparison of various installation schemes,a method of installing the girders was formulated and presented in the article,in which the girder was fabricated integratively,assembled at installation site,and installed with an adjustable arch.
文章从方案比较、安装技术设计、安装工艺等方面,详细介绍了大型箱形吊车梁整体成型、现场拼装、起拱度调整的安装技术。
5) pitch of arch

拱高度
6) soil arch height

土拱高度
1.
Finally,considering the different height of the embankments,the soil arch height determination method is developed based on the proposed partially-developing soil arching method.
最后考虑不同的填土高度,以不完全发展的土拱效应计算理论为基础得到土拱高度确定方法。
补充资料:泵安装高度
分子式:
CAS号:
性质: 指泵安装的基准面至被送液体液面的垂直距离。即泵基准面标高与被送液体液面标高之差。单位方m。为保证泵不产生汽蚀,能正常吸入和排出被送液体,吸上泵装置的泵,安装高度必须低于泵的最大吸上高度;灌注泵装置的泵,安装高度必须大于泵的最小静吸入压头。水泵的传统习惯,在计算时,规定吸上泵装置的泵安装高度数值为正值;灌注泵装置的泵安装高度数值为负值。
CAS号:
性质: 指泵安装的基准面至被送液体液面的垂直距离。即泵基准面标高与被送液体液面标高之差。单位方m。为保证泵不产生汽蚀,能正常吸入和排出被送液体,吸上泵装置的泵,安装高度必须低于泵的最大吸上高度;灌注泵装置的泵,安装高度必须大于泵的最小静吸入压头。水泵的传统习惯,在计算时,规定吸上泵装置的泵安装高度数值为正值;灌注泵装置的泵安装高度数值为负值。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条