1) Period of land use for mining

采矿用地周期
3) Land devoted to mining.

土地留做采矿用
4) sample period

采样周期
1.
In view of the character of shearers drum lifting by memory program controlling,this paper analyzes various factors influencing sample period.
针对采煤机滚筒记忆程控调高的特征,分析了影响采样周期大小的诸多因素,以采煤机牵引行走位移作为采样间隔的标尺,给出了等位移间隔作为采样周期的理论值。
2.
The relation of the control error, induced with the sample measurment, to the sample period has been analyzed and the choice of the sample period is also given.
分析了开关量信号接入模式下行程位移量调节过程中采样测量时间上的滞后引入的控制误差与采样周期的关系 ,并给出了采样周期的选择原
3.
Because there is pure delay time τ in the object , so it is taken to be better choice that the sample period T is equal to pure delay time τ , and some literature persists in this opinion also .
在纯滞后系统中 ,由于对象存在纯滞后时间τ ,因此常使人觉得 ,对这类系统的控制 ,采样周期选择为τ控制效果比较好 ,而一些文献也执此观点。
5) sampling period

采样周期
1.
Optimal sampling period selection methed for network control system;

网络控制系统中采样周期的优化选取方法
2.
The effect of sampling periods disturbance on discrete linear system;

采样周期干扰对离散线性系统的影响
3.
Maneuvering target model based on small sampling period;

一种基于小采样周期的机动目标模型
6) cyclic production

周期采油
补充资料:在什么情况下用地单位的有关用地收回
答:用地单位有下列情况之一者,该用地由城市规划行政主管部门收回另行处理:
1、不按批准的用途使用的;
2、用地单位民已经撤消或迁移的;
3、未经城市规划行政主管部门同意延期,连续两年未使用的;
4、建设用地规划许可证被吊销的;
5、市政设施、军事设施、铁路、公路、机场、抗场等用地经过核准不用的;
6、用地单位因建设计划变更不再使用或多余的;
7、用地单位闲置的土地;
8、未取得建设用地规划许可证而取得建设用地地批准文件、占用土地的;
城市规划行政主管部门有权根据城市规划建设需要,对城市规划区内的土地进行再按排。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条