1)  total float
总时差
1.
In this paper,we study the efficiency of total floats and single floats in CPM network and their applications in the project management.
本文研究CPM网络计划中总时差和单时差的使用效率问题及在项目管理中的应用。
2)  total float time
总时差
1.
Study on the calculation method for the work s total float time;
工作总时差计算方法的探讨
2.
In this paper, algorithms of total float time and free float time about activities in a fuzzy network are presented, and the method using activities total float time to determine critical activities and path in a fuzzy network is given.
提出了模糊网络中工序总时差和单时差的算法,同时给出了关键工序和关键路线的工序总时差判别方法。
3.
The total float time is one of the important time parameters of the work,and its value is the basis to determine the critical works and pathes.
工作总时差是工作最主要的基本时间参数之一,其大小是网络图中关键工作和关键线路的判别依据。
3)  total time difference
总时差
1.
The basic principle of total time difference is analyzed,and a new thought of weight earned value is put forward.
指出了传统挣得值分析方法在项目进度评测中存在的不足,在分析任务总时差的性质的基础上引入了含权挣得值的概念来解决这个问题,并给出了含权挣得值的计算公式和分析步骤。
4)  total float theorem
总时差定理
5)  peak instantaneous total error
峰值瞬时总误差
6)  gross difference
总差