1) initial operation stage

初期运行期
1.
In initial operation stage,the primary task of flood control operating of the three gorges hydro-complex is enssuring the construction safety of Three Gorges project and the gezhouba hydro-complex during the flood season.
叙述了三峡水利枢纽初期运行期防洪调度的主要任务,即在保证三峡水利枢纽工程及施工安全和葛洲坝水利枢纽度汛安全的前提下,利用水库拦蓄洪水,提高荆江河段防洪标准。
2.
Based on the operation characteristics of the Three Gorges reservoir and power station in the initial operation stage and the demand for the down-stream navigation channel, in this paper calculated is the peak regulation capacity of the Three Gorges Hydropower Plant for different inflows and different unit numbers by equal step enumeration searching method.
根据初期运行期三峡水库、电站运行特点及下游航道要求,利用等间距穷举搜索的方法,对不同来水、不同装机情况下电站的调峰能力进行了计算,并利用不恒定流数学模型对推求的调峰幅度所对应的出力过程和下泄流量过程进行演算校验,从而使计算结果更符合工程实际的要求。
2) initial operation

初期运行
1.
Practice of initial operation and management of Xiaolangdi Multipurpose Project;

小浪底水利枢纽的初期运行管理实践
2.
Based on years experiences in dam safety monitoring automation construction,the problem of long-term stability of the dam safety monitoring automation system is solved by establishing the mechanism of initial operation.
总结多年来水库大坝安全监测自动化系统建设的经验,研究以建立初期运行的方法解决大坝安全监测自动化系统长期稳定运行的问题。
3) initial operation period

运行初期
1.
Management of hydraulic structures at Three Gorges hydropower station during initial operation period;
三峡水电站运行初期水工建筑物管理实践与探讨
4) initial operation of the project

枢纽初期运行
5) introductory strategy

初期运行策略
6) first operating period

初期运行阶段
补充资料:蛙的发育神经胚期(初期)
[图]

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条