1) second-stage project in Fenhe River

汾河二期工程
3) Fenhe Second reservoir

汾河二库
1.
[Objective]To know about the eutrophic condition of present Fenhe Second reservoir.

[目的]了解汾河二库水体现阶段的富营养状况。
4) Fenhe Reservoir Two

汾河二库
1.
Analysis on and Treatment of the Cracks on the Rolled Concrete Dam Surface of the Fenhe Reservoir Two;
汾河二库碾压砼大坝坝面裂缝的分析与处理
2.
The Main Construction Techniques Adopted in the Key Project of Fenhe Reservoir Two;

汾河二库枢纽工程主要施工技术
5) NO.2 Fenhe reservoir

汾河二库
1.
Application of Rolled Concrete in the Large Dam Engineering of No.2 Fenhe Reservoir;

碾压混凝土在汾河二库大坝工程中的应用
6) No.2 Dam of Fenhe Reservoir

汾河二坝
1.
The Analytical Calculations of the Design Flood under the Current Conditions of the No.2 Dam of Fenhe Reservoir
汾河二坝现状条件下设计洪水分析计算
补充资料:葛洲坝水利枢纽二期工程的工地
葛洲坝水利枢纽二期工程的工地
葛洲坝水利枢纽二期工程的工地
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条