1) RCC cofferdam

RCC围堰
1.
Key technologies and design for RCC cofferdam removal of Three Gorge Reservoir;

三峡三期RCC围堰拆除方案与设计关键技术研究
2.
Blasting Technology for Dismantling the RCC Cofferdam of Letan Hydropower Project;

乐滩水电站RCC围堰拆除爆破技术
3.
By introducing the way of the construction of readers blasting,network used in the Sanxia Gorges RCC cofferdam demolition,it can be understood in deeply and used as a reference for similar projects.
文章介绍了I-Kon电子起爆系统组成、工作原理和优缺点,通过介绍三峡RCC围堰拆除爆破网路施工总结,以便读者更深入地了解I-Kon电子起爆系统,旨在今后供同类施工借鉴。
2) downstream RCC cofferdam

下游RCC围堰
1.
The concrete construction of downstream RCC cofferdam of Goupitan Hydropower Station has the feactures of short construction period, high intensity, and high quality requirement.
构皮滩水电站下游RCC围堰混凝土施工具有工期紧、强度大、施工质量要求高等特点。
3) RCC cofferdam dismantling

RCC围堰拆除
4) third-stage RCC cofferdam

三期RCC围堰
1.
Key technical problems of the construction of the third-stage RCC cofferdam of Three Gorges Project;
三峡三期RCC围堰施工关键技术
5) RCC cofferdam of TGP

三峡工程RCC围堰
1.
The demolition blasting of RCC cofferdam of TGP is carried out underwater 40 m depth;the analog test is done to examine the watertightness and the bond resistance of blast-hole stems;the details are described.
三峡工程RCC围堰拆除爆破是在水下40 m深处进行,为了验证炮孔封堵材料的密封性和粘着抗力而进行了模拟试验,对试验的细节加以介绍。
6) the stage III works (RCC Cofferdam project) of the Three Gorges Project

三峡Ⅲ期RCC围堰
补充资料:围堰
围堰 cofferdam 围护水工建筑物施工场地,使免受河水影响的临时挡水建筑物。围堰要求施工简单,维护容易,拆除方便,并能满足稳定、防渗、抗冲及一定强度的要求。按与水流方向的相对关系,分为垂直河流方向的横向围堰和平行河流方向的纵向围堰。按是否允许过水,分为过水围堰和不过水围堰。按修建所用材料划分,常用的有土石围堰与混凝土围堰,还有草土围堰、板桩围堰,以及木笼、竹笼或铅丝笼装石围堰等。土石围堰就地取材、结构简单、施工方便,对地基要求较低,故被广泛采用,又分土围堰、土石混合围堰和堆石围堰。混凝土围堰需在岩基上采用,其断面小,占地少,抗冲防渗性能好,堰顶可以过水。板桩围堰有钢板桩、木板桩和钢筋混凝土板桩等形式,可布置成单排、双排或格形体,各有其使用条件。木笼装石围堰可抗4~6米/秒流速,堰顶浇筑混凝土板后可以溢流,可在岸上预制、水上沉放,施工较快,但木材耗用多,拆除不便,现已很少使用。竹笼装石围堰和铅丝笼装石围堰多在中小型工程或局部地段使用。草土围堰是中国黄河流域传统的围堰结构、层土层草,可在流速2~3.5米/秒流水中修筑,挡水高度一般不超过6米。它构造简单,施工方便,拆除容易,但草料用量大,沉陷量较大,草料易腐烂,使用期一般不超过两年。 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条