说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 索道管
1)  cable duct
索道管
1.
The technique for precise positioning of cable ducts is one of the key techniques for construction of cable-stayed bridges.
索道管的精密定位是斜拉桥施工的关键技术之一。
2.
The positioning survey of anchor padding plates and cable ducts is a kind of survey work requiring very strict precision in the construction of a cable-stayed bridge.
锚垫板与索道管定位是斜拉桥施工过程中精度要求很高的测量工作。
3.
By way of example of Weiliu Road Bridge over Railway Lines in Ji nan, this paper describes the principles of positioning of cable ducts in pylons of cable-stayed bridge, method of construction setting-out, survey process and analysis of the survey results.
以济南纬六路跨铁路特大桥为例,介绍斜拉桥主塔索道管的定位原理、施工放样方法、施测过程及精度分析。
2)  cable duct positioning
索道管定位
3)  pipeline suspension bridge
悬索管道桥
1.
Anti-wind character analysis of a large span pipeline suspension bridge;
大跨悬索管道桥抗风特性分析
2.
The testing study on the wind resistant behavior of pipeline suspension bridge
悬索管道桥抗风性能的试验研究
3.
Long-span pipeline suspension bridges always show notable flexibility because of their narrow deck and small ratio of large deck width to span length.
大跨度悬索管道桥桥面窄,宽跨比小,结构十分轻柔,结构参数的改变对其动力特性有较大的影响。
4)  cableway [英]['keiblwei]  [美]['kebḷ,we]
索道电缆管道的管孔
5)  pig chasing
清管器沿管道运动探索
6)  Cableway [英]['keiblwei]  [美]['kebḷ,we]
索道
1.
Quality Control on Hot Galvanizing of Steel Stand and Support of Cableway;
索道钢支架支柱热镀锌的质量控制
2.
A Analysis on Culative Tractive Tension with Close Rope of Cableway in Single Span;
单跨索道闭合牵引索拉力分析
3.
:The article introduces the electric design of cableway's cable exchanging which drived by double sym- metrical motor, expatiate on the composing,the principle and the calculation of the electric system.
论述了一种采用双对称驱动的索道换绳装置的电控系统设计,并详述了系统的构成、原理和计算。
补充资料:管山吃山﹐管水吃水
1.比喻干什么事情﹐就靠什么生活。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条