说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 检验评定方法
1)  test evaluating method
检验评定方法
1.
Issues on test evaluating method of concrete durability with proposals;
混凝土耐久性检验评定方法的若干问题和建议
2)  inspection and evaluation
检验评定
3)  Assessment and check
评定检验
4)  method of calibration
检验方法,标定方法
5)  inspection method
检验方法
1.
Construction technology and inspection method expressway soil-stone mixture filled roadbed;
高速公路土石混填路基的施工工艺和检验方法
2.
The conjunction between intellectual property right and technical standard and it's inspection method
技术标准与知识产权关联及其检验方法研究
3.
With experimental inspection method of sensory inspection, microscope inspection, pigment quantitative inspection, the 125-share suspected adulterated condiment on market, divided into six types as pepper, xanthoxylum, ginger powder, aniseed powder, ground species,and cayenne pepper, were inspected in Lanzhou and the subsidiary cities and counties of Gansu province.
采用感官检查、显微镜检查、色素定性检查等检验方法,对甘肃省兰州市及各地市(县)的市售胡椒粉、花椒粉、姜粉、八角粉、五香粉、辣椒粉6个品种125份可疑掺伪劣质的调味粉进行了检验。
6)  testing methods
检验方法
1.
Study on evaluation system for toxicology testing methods;
法庭毒物检验方法评价体系的建立
2.
In order to compare and analyze the performance of hydrological time variation series change-point testing method,three types of hydrological series are generated by hydrological variation series generator,and statistical experiment is used to analyze the performance of the 10 variation series testing methods.
通过设计的水文变异序列生成器生成满足P-型分布及统计参数,用统计实验的方法比较分析了10种常用水文序列变异点检验方法对3类变异序列的性能检验。
3.
Taking the measure of uncorking on the steel tube and filling water before sand filling,the installation process of sand compaction piles is optimized,the installation parameters and testing rate under the near shore condition are confirmed,and the control and testing methods for the piles quality are summarized.
采取桩管壁开孔、先灌水后灌砂的方法,优化了水上挤密砂桩的施工工艺;给出了在近岸无掩护、水流急的施工条件下的施工参数和检验比率,总结了沉桩定位、高程控制、灌砂率等参数的控制措施和检验方法。
补充资料:《房屋修缮工程质量检验评定标准》


《房屋修缮工程质量检验评定标准》


  《房屋修缮工程质量检验评定标准》中国建设部颁布的规章之一。房屋修缮施工单位对完成的工程项日,要根据《房屋修缮工程质量检验评定标准》评定质量等级.进行竣工验收,不合格的不准交工。在工程正式交验前应预检,对整个工程项目、设备运转情况及有关技术资料全面进行检查,对检查出的问题应做好记录,定期解决,然后才邀请发包、设计单位正式验收。竣工验收的依据一般应包括:工程合同、修缮设计或修缮方案,及有关图纸或技术说明、会审交底记录、设计变更鉴证、材料试验报告单、隐蔽工程验鉴记录、房屋设备安装试调和试压记录等技术资料。竣工交验标准是:全部完成合同及设计(方案)要求的工程内容,质量符合标准及设计(方案)要求;具备住用条件,门窗开闭灵活、严密,灯亮,水通,煤气通,烟道通,暖气热,装修设备完好,场地整洁,排水和道路畅通,余料弃土清理完毕;技术资料齐全、准确;作出质量评语,填写单位工程质量评定表;原有修缮设计图纸的工程,要提交竣工图。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条