1) the hangzhou bay bridge
50m/1430t预应力混凝土箱梁
1.
This article introduce the centralized pre-binding&integral hoisting steel-bar construction technology on 50m/1430t box girder of the hangzhou bay bridge.
结合杭州湾跨海大桥50m/1430t预应力混凝土箱梁整孔预制施工作业,详细介绍了钢筋预扎台座设计、整体吊装架设计、施工设备配置和主要分项工程施工工艺要点。
2) pre-stressed concrete pre-fabricated box girder
预应力混凝土预制箱梁
1.
Combined with the pre-fabrication process of the in-situ box girder of south junction J1 Bid bridge of Runyang Bridge,the article introduces in detail the construction technology of pre-stressed concrete pre-fabricated box girder by post-tensioning method and the relative points for attention in the course of construction.
该文结合润扬大桥南接线J1标桥梁现场箱梁的预制过程,具体的介绍了后张法预应力混凝土预制箱梁的施工工艺,以及在施工过程中应注意的有关事项。
3) prestressed concrete box beam
预应力混凝土箱梁
1.
This result has a certain meaning to calculate the temperature stress and deflection of prestressed concrete box beam.
通过有限元程序ANSYS模拟温度场的方法和某桥实测数据比较,分析了影响预应力混凝土箱梁模型温度场分布的因素,得出了太阳辐射吸收系数对计算结果的影响比较大的结论,该结论对计算预应力混凝土箱梁的温度应力和挠度有一定的意义。
2.
Some problems existing in the construction of prestressed concrete box beam are in- troduced, and some views and measures are put forward in the paper.
介绍了预应力混凝土箱梁施工中存在的问题,提出了自己的见解及相应的措施。
4) prestressed concrete continuous box girder
预应力混凝土连续箱梁
1.
Now cantilever construction of prestressed concrete continuous box girder as the chief construct methord in engineering has gone intio the rang of mature.
预应力混凝土连续箱梁的悬臂施工作为大跨径桥梁的主要建设方式日渐成熟,但此类桥梁设计、施工中仍然存在着某些关键问题其处理方式比较含糊。
5) simple prestressed concrete beam
预应力混凝土简支箱梁
1.
Taking Guangzhou Station construction along Wuhan-Guangzhou Passenger Line,this paper introduces and analyzes new standards and techniques of simple prestressed concrete beam construction,providing a general knowledge for the readers with construction control in this project.
文章以武广客运专线新建铁路新广州站及相关工程为例,介绍和分析高速铁路预制预应力混凝土简支箱梁施工的一些新标准和工艺,让读者对高速铁路预制预应力混凝土简支箱梁的施工控制有概貌性的认识。
6) PC box girder
预应力混凝土箱梁
1.
The phenomenon of web and anchorage zone cracks of continuous PC box girder is fairly common.
针对目前预应力混凝土箱梁腹板开裂现象比较普遍这一现象,拟从预应力混凝土箱梁顶板横向预应力框架效应查找开裂原因。
2.
A long term field monitoring was performed over the creepage of PC box girder of Jinbin Light Rail.
对津滨轻轨预应力混凝土箱梁的混凝土徐变发展规律进行长期的现场监测。
3.
However, China highway and bridge criterions don\'t make detailed regulations about temperature gradient of PC box girder bridge.
而现行的中国公路桥梁规范对预应力混凝土箱梁的空间温度梯度并未做详细的规定,研究和探讨符合真实情况的混凝土箱梁桥最不利温度梯度,具有重要的理论意义和实用价值。
补充资料:RO-CM-1430
CAS:56131-49-8
分子式:C17H15NO2
分子质量:265.31
中文名称:丙基苯甲酸对氰基苯酚酯
英文名称:4-Cyanophenyl-propylbenzoate;ME3N;RO-CM-1430
分子式:C17H15NO2
分子质量:265.31
中文名称:丙基苯甲酸对氰基苯酚酯
英文名称:4-Cyanophenyl-propylbenzoate;ME3N;RO-CM-1430
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条