1) evaluation on construction resource

施工资源评定法
2) resource assessment methodology

资源评定方法
3) working sources

施工资源
1.
Based on the designed limit time of the project,combined the restriction of the working space and the working ground,the paper used fuzzy multi hierachical comprehensive evaluation and put forward two optimum decision making models that meet update level of social construction capacity and the working sources that a construction corporation owned.
从工程的计划工期出发,结合施工作业空间、施工场地对施工资源的使用种类、数量的限制,利用模糊数学知识,采用综合评判的方法,提出了现有社会生产力水平条件下及某施工企业具有施工资源条件下的两类施工方案评判模型,并以路基工程为例,给出了一实例,验证表明由上述模型决策所得的施工方案切实可
4) Quantitative assessment of water resources

水资源定量评价
5) quantitative resource assessment

定量资源评价
6) job ranking method

工作评定法
补充资料:电力工程施工质量检验及评定标准
电力工程施工质量检验及评定标准
standards for inspecting and assessing construction quality of electric power projects
d ianli gongeheng sh一gong zhl}一angJ一anyan!IP一ngdingbiaozhun电力工程施工质,检验及评定标准(stan-dards for ins伴eting and assessing eonstruetionquality of eleetrie Power projeets)中国电力主管部门对电力工程施工质量检验及评定的范围、内容、检验指标和质量标准等所做的规定。 1983~1992年,国家电力主管部门陆续颁发T《火电施工质量检验及评定标准(试行)》,其中包括建筑工程、钢筋混凝土烟囱和双曲线型冷却塔、锅炉、汽机、电气、热工仪表及控制装里、管道、水处理及制氮装t、焊接工程、加工配制、火电工程调整试运等n篇.每篇的内容结构均包括:总则;单位工程、分部工程和分项工程的性质、检验单位(部门)划分;通用标准.分项(专业)检验指标、性质、标准及检验方法和器具;分项工程、分部工程和单位工程质量检验及评定表格。 随着电力建设的发展,装机容量的增大,专业技术和热工自动化水平的提高,电力工业部从1993年开始修订《火电施工质量检验及评定标准》。1994年,完成建筑工程、钢筋混凝土烟囱和双曲线型冷却塔两篇的修订,并合并为新的建筑工程篇颁发执行。1996年修订颁发了锅炉、焊接、调试三篇。1998年又修订颁发了汽机、热控两篇,并对管道篇、水处理及制氮装t篇、加工配制篇进行了修订. 建筑工程篇适用于单机容量为80万kw及以下的火力发电厂土建工程(含烟囱及双曲线钢筋混凝土冷却水塔)施工质量检验及评定.变电所土建工程的施工质量检验评定,可参照执行。 锅炉篇适用于与火力发电厂国产单机容量30~60万kw机组配套的煤粉炉安装施工(含分部试运)质盆检验及评定。对于其它炉型、容量、参数的国产锅炉机组可供参考。对国外进口锅炉机组的施工质t检验及评定,应执行设备进口《订货技术合同》或制造厂的规定。如制造厂无明确规定,则应执行本篇。 汽机篇适用于火力发电厂单机容量30一60万kw国产机组安装质量检验及评定。30万kw以下机组安装质t检验及评定,继续使用原《标准》汽机篇(试行本)。对国外进口汽轮发电机组的施工质量检验及评定,应执行设备进口《订货技术合同》和制造厂的规定。如制造厂无明确规定,则应执行本篇. 电气篇适用电力工程中的电气装置的安装. 热工仪表及控制装里篇适用于火力发电厂单机容最为60万kw及以下国产机组的热工仪表及控制装t安装(包括单体调试)质量检验及评定。对国外进口机组的施工质量检验及评定,应执行设备进口《订货技术合同》或制造厂的规定。如无明确规定,则应执行本篇。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条