1) Laokou complex
老口枢纽
1.
Influence of Baise reservoir flood dispatching rule on flood control storage capacity of Laokou complex;
百色水库防洪调度规则对老口枢纽防洪库容的影响分析
2.
Dam foundation rock body engineering geological characteristic analysis for US dam site of Laokou Complex;
老口枢纽工程上坝址坝基岩体的工程地质特性分析
2) Laoloukou water complex project
老龙口水利枢纽
1.
This paper introduces the engineering geology and construction period safety monitoring design for Laoloukou water complex project,and expounds the monitoring results during construction and analyses the deformation law and features of wall rock.
简单介绍了老龙口水利枢纽导流洞的工程地质概况及施工期安全监测设计,详细阐述了施工期安全监测成果,对围岩的变形规律及特征进行了深入的分析。
3) Laolongkou Water Control Project
老龙口水利枢纽工程
1.
The sand-gravel material for filling the shell of the dam of Laolongkou Water Control Project is just from a gold-mining tailing,which has a greater specificity if compared with the natural materials for the grade-parameter.
老龙口水利枢纽工程大坝坝壳填筑用砂砾料为采金弃料,该料在级配参数上与天然砂砾料有较大的特异性。
5) Hub port
港口枢纽
1.
With the development of containerized and logisticallized transportation, and the pressure brought to port product by the large and high speed container ship, it is apparent that optimization study on container transportation organization in hub port is becoming increasingly important.
随着运输的集装箱化和物流化的发展 ,以及集装箱船舶的大型化、高速化给港口生产带来了巨大的压力 ,港口枢纽集装箱运输的组织优化研究也显得日益重要。
6) Haikou Project
海口枢纽
1.
Haikou project is a key project in the end of waterway to ocean.
海口枢纽是入海水道的出海控制口门,其设计的好坏直接关系到入海水道功效的发挥。
补充资料:老口儿
1.指老年夫妻。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条