1)  construction allowance for settlement
施工预留沉降量
1.
Base on the analysis of a real example of determination of dike top construction allowance for settlement for heightening a submerged dike on soft soil,this paper studied and discussed the method for determining the construction elevation in heightening of submerged dike.
通过某软土地基潜堤加高堤顶施工预留沉降量确定方法的实例分析,探讨旧堤加高施工高程确定方法。
2)  preformed settlement
预留沉降量
1.
With the technical development of the railway,the high stability of line and subgrade are required to support high running speed,hence accurately controlling and estimating the preformed settlement of the embankment are very important.
因此就必须在施工时预留沉降量。
3)  construction settlement
施工沉降
1.
Taking the construction of Qingnian Avenue Station as example,the author presents such measures as the surface treatment of the utility pipelines,the control of the construction settlement and the advance ground consolidation that are taken during construction in order to protect the utility pipelines and to guarantee the construction safety.
选用沈阳地铁青年大街站在粉细砂层中近距离下穿污水管线这一典型施工案例,阐述了在近距离下穿污水管线施工时为保护管线和施工安全采用的管线地面处理、控制施工沉降、超前地层加固等施工技术,以期为今后类似工程的施工提供参考和借鉴。
4)  reserved construction pre-arched
预留施工预拱度
5)  settlement prediction
沉降量预测
6)  settlement after construction
工后沉降量
1.
Based on the site settlement information of soft soil highway section of Nan Rao Cheng highway of Yangzhou city, the settlement after construction of every stage is forecasted by the method of hyperbola.
根据扬州市南绕城公路软土路段的实测沉降资料 ,采用双曲线法预测各施工阶段测点的沉降和工后沉降量 ,为路面结构层的铺设及间歇期的确定提供了依