说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 广州水泥厂
1)  Guangzhou cement factory
广州水泥厂
1.
Renovation plan of Guangzhou cement factory takes marginal concept in ecology and studies the renewal mechanism of old city margin to maximize land value.
广州水泥厂改造与更新规划运用生态学边缘效应的概念及其运作机理,探讨旧城中心边缘地段的更新、发展机制,实现土地功能使用效益最佳化;注重对厂区原有建筑和环境的保留和利用,引入现代景观设计的概念和手法,使新旧建筑有机结合,保护和延续城市文脉。
2)  Guangzhou Pumped Storage Plant
广州蓄能水电厂
1.
The efficiency test of the electric generator of the Guangzhou Pumped Storage Plant (second stage) was conducted in the No.
广州蓄能水电厂 (二期 )电动发电机的效率试验在 7号机上进行 ,由西门子公司试验专家负责现场实施。
2.
In the design and implementation of observation system of horizontal displacement of the dam for the upper reservoir of Guangzhou Pumped Storage Plant, such observation methods and their a.
在广州蓄能水电厂上库坝水平位移观测系统设计实施过程中 ,对这两种前方交会法的观测方法及其精度进行了深入的比较 ,最终选择了测边前方交会法。
3)  Guangzhou Pumped Storage Power Station
广州蓄能水电厂
1.
The International Benchmarking Program in Guangzhou Pumped Storage Power Station is introduced,including the benchmarking′ method,procedure and results,and the characteristics of benchmarking is analyzed.
广州蓄能水电厂为寻求不断改善生产经营业务流程和工作绩效而实施了国际对标工作,包括:对标内容、方法及实施过程、成果和特点;并结合国内电力系统标杆管理经验,提出了水电厂同业对标的探索性意见,可供同行参考。
2.
On the basis of the actual measurement and analysis of pressure pulse of the 300 MW pumped storage units for the Guangzhou Pumped storage Power Station (first stage), the author describes the arrangement of testing points, analysis methods and basic parameters.
通过对广州蓄能水电厂 (一期 ) 30 0MW抽水蓄能机组压力脉动的实测与分析 ,就测点布置、分析方法与基本参数作了说明 ,并对测点信号时域特征和频域特性进行了研究 ,给出了压力脉动沿流道的分布。
3.
The layout,configuration and relative function of the stability monitoring and tracking analyzing system for pump turbine units in Guangzhou Pumped storage Power Station are introduced in this paper.
介绍了广州蓄能水电厂水泵水轮机组稳定性状态监测及跟踪分析系统的布置、结构组成以及相关的功
4)  Guangzhou Pumped storage Power Plant
广州抽水蓄能水电厂
5)  Guangzhou copper products plant
广州铜材厂
6)  Guangzhou paper mill
广州造纸厂
1.
The analysis of the problems existing during the commissioning of CDSI desulphurization system in the high pressure thermal power station of Guangzhou paper mill and of the solutions to the problems provides valuable experience to later project
通过对广州造纸厂高压热电站锅炉烟气干式脱硫系统在试运行中所存在的问题进行分析和采取的解决措施 ,为以后的工程建设积累宝贵的实践经验。
补充资料:《广州话方言词典》
      见汉语方言词典。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条