1) bidirectional construction

双向施工
2) twin pump operation

双泵施工
3) reversion construction

逆向施工
4) upward construction

顺向施工
1.
In this article, deformation control of upper bearing-load structure with upward construction order and formwork deformation control of lower bearing-load structure was discussed.
本文针对这样的结构,对上承力结构顺向施工的变形调控技术以及下承力结构为降低施工成本而运用的支模变形调控技术进行进行了研究。
5) forward construction

正向施工
6) vertical construction joint

竖向施工缝
1.
Through the discussion about the method of two-time construction for the retained vertical construction joint of independent column base of cast-in-site reinforced concrete under the specified conditions,this article analyzes the retaining principle,the construction method and the load transfer mechanism of the embedded section steel,and summarizes the experiences of practical projects.
通过对特定条件下现浇钢筋混凝土柱下独立基础留置竖向施工缝分两次施工的做法进行探讨,分析了竖向施工缝的留置原则、施工方法和在竖向施工缝处埋设型钢的传力机理,总结了工程实践经验。
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条