1) hopper pre-settling

斗槽预沉
2) sediment trough

沉沙斗槽
1.
The main objects of the expreiment is to study and look for the reasonable structure and operation method of the sediment trough to be built to guarantee the water supply for Zhonger coal mine .
本项试验的主要目的是研究和寻找为保证准格尔煤田生产用水而修建的沉沙斗槽的合理结构和运行方式。
3) preliminarysedimentationtank

预沉降槽
4) diversion flume

斗槽
5) intake hopper

取水斗槽
6) service duct for running of electric cable conduct

电线槽斗
补充资料:135kA中间下料预焙阳极铝电解槽(抚顺铝厂)
135kA中间下料预焙阳极铝电解槽(抚顺铝厂)
赢 135kA中间下料预焙阳极铝电解槽(抚顺铝厂)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条