说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 锚具安装
1)  anchorage installation
锚具安装
1.
The following paper illustrates pre-stressed tensioning technique from stretching apparatus,tensioning control,tensioning operation,stretching order,tensioning procedure,anchorage installation and safety problem,and discusses the control of pre-stress loss in the stage of tension,in order to ensure the construction quality of pre-stressed concrete beam slab.
从张拉设备、张拉控制、张拉操作、张拉顺序、张拉程序、锚具安装及其安全问题等方面对预应力张拉技术进行了详细阐述,并对张拉阶段预应力的损失控制进行了论述,以保证预应力混凝土梁(板)的施工质量。
2)  installation of tie rod
锚杆安装
1.
Construction methods, quality requirements and quality control for installation of tie rods in anchorage blocks of Shantou Bay Suspension Bridge, and technology of production and casting of large volume concrete for the blocks are presented.
介绍了汕头海湾大桥锚碇工程中的锚杆安装施工方法、质量要求和控制,以及锚碇大体积混凝土的生产与灌
3)  anchor chain installation
锚链安装
4)  anchorage fixing
锚固安装
5)  installtion cable
安装锚链
1.
Some study about this found thatthe the tension of installtion cable and the physical characteristic of seabed cannot beignored for studying the initial penetration of VLA.
而在初始深度的研究中发现,安装锚链的拉力及海床土体性质对VLA初始贯入度的影响是不可忽略的。
6)  lamp installation
灯具安装
补充资料:设备的安装——设置安装基准
设备的安装——设置安装基准
 

 

 
文章编辑:moji
文章来源:
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条