1) Longma Power Station
龙马水电站
1.
Aanalysis on Spillway Slope Collapse Forecast in Longma Power Station;
云南龙马水电站溢洪道边坡失稳预报分析
2) Longtan Hydropower Station
龙滩水电站
1.
Practice and Experience of Environment Protection and Water-soil Conservation Supervision for Longtan Hydropower Station;
龙滩水电站环保水保综合监理的实践与体会
2.
Waste Water Disposal for Macun Aggregate Production System of Longtan Hydropower Station;
龙滩水电站麻村砂石加工系统废水处理
3.
Engineering characteristics of defective geological bodies at right-bank dam abutment of Longtan Hydropower Station and analysis of their causes;
龙滩水电站右岸坝肩边坡不良地质体特征及成因分析
3) Long-pan Hydropower Station
龙盘水电站
1.
SWOT Analysis on Constructing the Long-pan Hydropower Station and the Hu-tiao Gorge Tourism for Coordinate Development in the Middle Section of the Jin-sha River;
云南金沙江中游河段龙盘水电站建设与虎跳峡河段旅游协同发展的SWOT分析
4) Longtan Hydropower Project
龙滩水电站
1.
Study on the general layout and key technical issues of Longtan Hydropower Project;
龙滩水电站枢纽布置及重大问题研究
2.
Brief introduction of financial management on the Longtan Hydropower Project;
浅谈龙滩水电站工程财务管理
3.
The paper gives a presentation of the excavation process of the underground main power house of the Longtan hydropower project, which is, at the moment, one of the largest underground chambers in the world.
文章介绍了目前世界上规模最大的地下洞室之一,龙滩水电站地下厂房系统的主厂房开挖施工过程。
5) Longtan Hydropower Station
龙潭水电站
1.
Abrasion resistance design and operation management for dam-bag of rubber dam for Longtan Hydropower Station
龙潭水电站工程橡胶坝袋抗磨损设计与运行管理
2.
Based on analyzing the actual result before or after the overˉvoltage protection improvement of the controlled silicon components of the excitation equipments of Longtan Hydropower Station,an effective method of overˉvoltage protection was introduced in this paper.
通过龙潭水电站对励磁装置可控硅元件实施过电压保护改进前后实际效果的分析,介绍了一种有效的过压保护方式。
3.
This paper introduced briefly the non-lining tunnel layout of the Longtan hydropower station and design general situation such as cave, base plate and catch pit.
简介龙潭水电站不衬砌隧洞洞线布置、傍山洞、底板和集石坑等设计概况,其中傍山洞水平覆盖厚度和隧洞底板的稳定引用挪威有关工程经验设计分析,经过2年运用检验和二次放空检查,表明设计是可行的。
6) longtan Hydroelectric Project
龙滩水电站
1.
Study on non-staged construction of NRL 400m scheme of Longtan Hydroelectric Project;
龙滩水电站按正常蓄水位400m方案一次建成研究
2.
Analysis and assessment on the stability of non-excavated slope with inverted creeping rock mass for Longtan Hydroelectric Project;
龙滩水电站蠕变岩体非开挖区边坡稳定性分析与评价
3.
Cause analysis and treatment on accumulatively weathered deep channel at right-bank dam abutment of Longtan Hydroelectric Project;
龙滩水电站右岸坝肩堆积风化深槽成因分析与治理
补充资料:马伦水电站
马伦水电站 |
Marun Hydropower Station |
| 概 述 |
| 马伦水电站位于伊朗胡齐斯坦省、马伦(Marun)河上,在贝赫贝汉(Behbahan)市东北19km。工程用于灌溉、防洪和发电。粘土心墙堆石坝,最大坝高165m,水库总库容12亿m3,水电站装机容量14.5万kW,灌溉农田面积5.5万hm\+2。工程于1987年开工,1998年完建。 |