1)  technique for joint construction
					 
	
					
				
				 
	
					
				搭接处施工技术
			
					2)  Alternate Construction
					 
	
					
				
				 
	
					
				搭接施工
				1.
					A Study on Time Optimization of Alternate Construction Network;
					 
					
						
						 
					
						搭接施工网络工期优化研究
					
					4)  multi-dependency construction schedule plan
					 
	
					
				
				 
	
					
				搭接施工计划
				1.
					In order to prepare and optimize multi-dependency construction schedule plan,it is very important to calculate the earliest start times,latest start times,earliest finish times,latest finish times,total floats,free floats and calculated project duration.
						
						为了编制和优化搭接施工计划,计算工作最早开始时间、最迟开始时间、最早完成时间、最迟完成时间、总时差、自由时差和计算工期十分重要。
					
					5)  technical treatment for the design and the construction
					 
	
					
				
				 
	
					
				计与施工处治技术
			
					6)  construction technique
					 
	
					
				
				 
	
					
				施工技术
				1.
					The deep water cushion cap steel plate pile coffered construction technique;
					 
					
						
						 
					
						深水承台钢板桩围堰施工技术
					2.
					The beam and slab isolation construction technique of the library of Southeast University;
						
						东南大学图书馆梁板分离施工技术
					3.
					Practice of Developing the Exquisite Course in Construction Technique of Hydraulic and Hydroelectric Project;
						
						建设《水利水电工程施工技术》精品课程的实践
					补充资料:在处
		1.到处;处处。
		
		说明:补充资料仅用于学习参考,请勿用于其它任何用途。
	参考词条