1) integral cantilever pour

整幅悬臂浇筑
2) cantilever concreting

悬臂浇筑
1.
The article makes detailed presentation of construction methods and techniques used in the cantilever concreting of the main Yinhe Bridge with form-traveler.
文章详细叙述了颍河特大桥主桥挂篮进行悬臂浇筑的施工方法和工艺等。
3) cantilever casting

悬臂浇筑
1.
Control technique for construction of pre-stressed-concrete cantilever casting bridge;

预应力混凝土桥梁悬臂浇筑的施工控制
2.
Youdungang Bridge is a continuous box girder bridge with the main span of 80 m in Qingpu Area,Shanghai,which has adopted cantilever casting.
上海市青浦区油墩港大桥是一座主跨80 m的连续梁大桥,采用挂篮对称悬臂浇筑。
4) cast-in-place cantilever method

悬臂浇筑
1.
At present,cast-in-place cantilever method is mainly used to construct the long span pre-stressed concrete continuous rigid-frame bridges.
大跨径预应力混凝土连续刚构桥梁目前常用的施工方法是悬臂浇筑法,为保证大桥的合拢精度以及大桥成桥后的线型符合设计要求,必须对大桥施工各梁段的立模标高进行有效控制。
2.
The simulated pressure test of the hanging basket of main equipment of cast-in-place cantilever method was carried out,every forcing data of main beam construction were pointed out so as to guarantee the construction quality of bridge main beam.
结合工程实例,对挂篮结构构造和受力情况进行了分析,对悬臂浇筑施工主要设备的挂篮进行了模拟加载试验,并指出用于主梁施工的各项受力指标,以确保大桥主梁的施工质量。
3.
In the recent years,the cast-in-place cantilever method for the construction of the prestressed concrete continuous bridge has been rapidly developed in our country,which put forward very high requirements for many aspects of the design and construction.
近年来随着悬臂浇筑预应力混凝土连续梁桥在我国快速发展,对设计和施工各方面提出了很高的要求。
5) cantilever pouring

悬臂浇筑
1.
Constructing linear control of continual beam bridge cantilever pouring in railway passenger traffic special line;
铁路客运专线连续梁桥悬臂浇筑施工线形控制
2.
Pipeline hindering test of continual box beam prestressed in cantilever pouring construction;
悬臂浇筑施工中连续箱梁预应力管道摩阻测试
3.
On hanging basket design for continuous beam bridge and cantilever pouring and its application
连续梁桥悬臂浇筑挂篮设计与应用
6) cantilever construction

悬臂浇筑
1.
Height control in cantilever construction of Taolaizhao Songhuajiang River Large Bridge;

陶赖昭松花江特大桥悬臂浇筑阶段高程控制
2.
The cantilever construction method is used for its building.

泸州长江二桥为大跨度非对称连续刚构,采用悬臂浇筑施工。
3.
The cantilever construction method is used and the main girder is divided into several sections and steps of pouring and prestressing.
马啸溪嘉陵江大桥为预应力连续刚构桥,采用悬臂浇筑施工法进行施工。
补充资料:混凝土浇筑
混凝土浇筑
concrete placement
到浇筑面之间的距离小于2.0米;③控制浇筑瘾度;一④消除浇筑过程中浮出表面的水分盯⑤在悯鹅洲厚面高计上并柱礼钟狮杆封时叼注右级新得凝土,一表1混凝土浇筑层的允许最大厚度┌─────────────┬───────────┐│一振一捣一器类别 │_侥筑层的允许最大厚度 │├───┬─────────┼───────────┤│令 │电动_一风动振捣器-│振捣器工帐度的。一8倍 ││ ├─────────┼───────────┤│ │漱嘛捣器- │翩器头长度ghl.25倍 │├───┼─────────┼───────────┤│表鸽一│金杯娜和单蜘筋结狮│卜2沁毫米-- ││面一_ ├─────────┼───────────┤│一烬器│在双房钠筋结构中_ │120毫米 │└───┴─────────┴───────────┘表公浇筑混凝土的允许间歇时间20一30工O一205一10 允许间普通硅酸盐水泥 9O 135 195-歇时间份)矿渣硅酸盆水呢及火山灰质硅酸盐水泥I即招O粼{粼撰
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条