1) Composite crunode

合成梁式结点
2) beam-column node

梁柱结点
3) the joints of column and beam

柱梁结点
4) concrete steel truss composite girder

桁梁结合梁
1.
Through numerical method,uplift force of the headed stud in concrete steel truss composite girder was analyzed under various conditions for the reference in designing.
借助于数值分析的方法,分析研究了我国某座正在建造中的公铁两用大桥所采用的桁梁结合梁的栓钉在三种不同荷载工况:顺桥方向不均匀竖载;轴力;横桥方向不均匀竖载和不同栓钉布置方案下所受的上拔力的数值。
5) beam structure

梁式结构
1.
Analysis on the influences of constructional reinforcement on temperature-shrink cracks of beam structure;
构造配筋对梁式结构温度收缩裂缝影响分析
2.
Determination and application of the maximum load of blast bearing capacity for a beam structure;
梁式结构承爆极限荷载的确定及应用
3.
The active vibration control of the beam structure, which is used in the isolation of the ship s auxiliary machines, is studied by using modal analysis method and adaptive algorithm in this paper.
以船舶辅机的梁式隔振结构为对象,运用模态分析方法和自适应算法,推导并分析了梁式结构振动主动控制的基本原理和方法。
6) Line-Point Pattern

点线结合模式
补充资料:闭式单点、双点压力机
| |||||||
主要参数内容 | 国际先进 | 国内先进 | 国内一般 | 国内落后 | 评定方法及说明 | ||
(一)加工精度 | 参照GB10924-89、GB10933-89、JB5200-91 | ||||||
1、滑块下平面对工作台上平面的平行度(mm) | 30%精度储备 | 20%精度储备 | 达到规定值 | 大于规定值 | |||
0.02+0.10/100×滑块下平面的被测长度 | |||||||
2、滑块行程对工作台上平面的垂直度 | 30%精度储备 | 20%精度储备 | 达到规定值 | 大于规定值 | |||
0.05+0.02/100×滑块行程长度 | |||||||
(二)结构性能 | |||||||
1、离合器、制动器接通率,当滑块行程次数≤16次/分时为70%,≤25次/分时为60%,≤45次/分时为50% | 大于规定值10% | 大于规定值 | 达到规定值 | 达不到规定值 | |||
2、液压超负荷保险装置、微调装置、吨位指示器 | 全部具有 | 全部具有 | 部分具有 | 没有 | |||
(三)噪声dB(A) | |||||||
1、公称力≤400kN | ≤85 | ≤87 | ≤88 | >88 | |||
2、公称力>400kN | ≤87 | ≤88 | ≤90 | >90 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条