1)  design of high-support mould
高支模设计
1.
Combined with specific engineering,it introduces design and stress check calculation of high-support mould for frame-beam of conversion layer,illustrates design of high-support mould is emphasis for safety management of construction,designer should be attention to ensure safety and quality.
结合工程实例,介绍了转换层框支梁高支模的设计及受力验算,阐明了高支模设计是施工安全技术管理中控制的重点,以引起设计人员的重视,确保框支梁的施工安全和质量。
2)  design of supporting of formwork
模板支撑设计
3)  schemes design of formwork support
支架模板设计
4)  Modular Design Support System
模块化设计支持系统
1.
The Study on Modular Design Support System;
模块化设计支持系统研究
5)  support design
支护设计
1.
Application of artificial neural network in highway tunnel’s support design;
神经元网络在公路隧道支护设计中的应用
2.
Research on stability and support design of strip coal pillar;
条带煤柱稳定性及支护设计研究
3.
Discussion on multi element balance dynamic feedback method of mining gateway support design
回采巷道支护设计的多元平衡动态反馈法探讨
6)  supporting design
支护设计
1.
The soil nailed supporting design when silt stratification existing;
存在淤泥层时的土钉支护设计
2.
Layout and supporting design of water diversion and power generation of Nuozhadu Hydropower Station;
糯扎渡水电站引水发电系统布置及支护设计
3.
Pre-stressed anchor supporting design for artificial roof based on reconstructed mining environment;
开采环境再造人工顶板锚索支护设计
补充资料:木工支模拆模安全技术操作规程
第1条 模板支撑不得使用腐朽、扭裂、劈裂的材料。顶撑要垂直,底端平整坚实,并加垫木。木楔要钉牢,并用横顺拉杆和剪刀撑拉牢。
第2条 采用行架支模应严格检查,发现严重变形、螺栓松动等应及时修复。
第3条 支模应按工序进行,模板没有固定前,不得进行下道工序。禁止利用拉杆、支撑攀登上下。
第4条 支设4米以上的立柱模板,四周必须顶牢,操作时要搭设工作台,不足4米的,可使用马凳操作。
第5条 支设独立梁、柱模应设临时工作台,不得站在柱模上操作和在梁启模上行走。
第6条 拆除模板应经施工技术人员同意。操作时应按顺序分段进行,严禁猛撬、硬砸或大面积撬落和拉倒。工完前;不得留下松动和悬挂的模板,拆下的模板应及时运送到指定地点集中堆放。
第7条 拆除薄腹梁、吊车梁、行架等预制构件模板,应随拆随加顶撑支牢。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。