1) static pile underpinning
静压桩托换
1.
The detection and appraisal on cracks,the selection of strengthening method,the designing and constructing of static pile underpinning are introduced.
介绍了该事故的检测鉴定、地基加固方法选择、坑式静压桩托换加固方案设计和地基加固施工情况,并在试验数据的基础上指出了用坑式静压桩法托换加固地基基础存在的桩顶压力滞后的问题。
2) anchor pile underpinning
锚杆静压桩托换
3) soil substitution with pressure piles
压桩托换
4) anchor arm dead pressure micro underpinned pile
锚杆静压微型托换桩
1.
The application of anchor arm dead pressure micro underpinned pile in plant basement strengthening;
锚杆静压微型托换桩在厂房基础加固中的应用
5) pre-stressed pile underpinning
预压桩托换
6) perloading pile
预压托换桩
1.
According to the rectifying deviation\'s engineering case of brick conceret structural building, perloading piles\'design,construction and results were introduced.
结合砖混结构顶升纠偏工程实例,介绍预压托换桩的设计、施工及成果,使后续主体结构顶升纠偏达到预期目的。
补充资料:基础托换
对原有基础进行加固和更换,以改善基础工作状态的技术措施。基础需要托换的原因很多,如在现有建筑物下进行隧道施工;地下水位下降引起房屋下沉;原有基础腐蚀或损坏等。托换技术已有数百年历史。但是,直到20世纪,由于大量兴建地下铁道,此技术才得到较大发展。
常用的托换技术有:①将拟托换的基础上的荷载传递到桩(或沉井)上。设置桩的方法有:千斤顶压入法、打入法及钻孔灌注法等。桩可能是粗直径的,定向排列的群桩,也可能是细直径的、不定向排列的树根桩。②从原结构物基底向下挖坑达到合适的地基持力层,然后用混凝土填充形成墩,使荷载传给墩;或者将基础扩大,以减小基底压力。这些方法适用于地下水位以上的基础。
托换基础施工要严格控制质量,保证原有基础与托换部分连接,使荷载能有效传递。同时,施工需分段进行,以避免原有建筑结构的应力变化过大,使安全得到确实保证。有时将基础托换与地基处理措施(如化学灌浆)结合进行,可以得到较好的效果。
常用的托换技术有:①将拟托换的基础上的荷载传递到桩(或沉井)上。设置桩的方法有:千斤顶压入法、打入法及钻孔灌注法等。桩可能是粗直径的,定向排列的群桩,也可能是细直径的、不定向排列的树根桩。②从原结构物基底向下挖坑达到合适的地基持力层,然后用混凝土填充形成墩,使荷载传给墩;或者将基础扩大,以减小基底压力。这些方法适用于地下水位以上的基础。
托换基础施工要严格控制质量,保证原有基础与托换部分连接,使荷载能有效传递。同时,施工需分段进行,以避免原有建筑结构的应力变化过大,使安全得到确实保证。有时将基础托换与地基处理措施(如化学灌浆)结合进行,可以得到较好的效果。