1) underlayer of heap leaching yard

堆场底垫
4) filling up gap's bottom

护底(垫底)
5) water bottom

水垫;垫底水
6) stacking yard

堆场
1.
The causes of cracking are analyzed according to the various structural layers of the concrete roads and stacking yards,and corresponding preventive measures are proposed.
从混凝土道路、堆场的各个结构层分析裂缝产生的原因和针对性地说明预防措施,阐述裂缝维修方法。
补充资料:底垫
1.喻基金。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条