1) Ajiutian Hydropower Station

阿鸠田水电站
1.
Application of the Speed Governor for Multi-nozzle Impulse Turbine to the Ajiutian Hydropower Station;
多喷嘴冲击式水轮机调速器在阿鸠田水电站的应用
2) Azhu Hydropower Station

阿珠水电站
1.
Selection of Unit for for Azhu Hydropower Station;

阿珠水电站机组机型选择
3) Ahai Hydropower Station

阿海水电站
1.
Using the concrete gravity dam of the Ahai Hydropower Station in Yunnan province as an example,parameter sensitivity analysis was performed by adjusting the mechanical parameters of the vertical layer and parallel layer.
基于大型通用商业软件ADINA,研究了倾斜层状岩体地基的有限元模型,并以云南阿海水电站混凝土重力坝为背景,通过调整地基垂直层面和平行层面的力学参数,进行敏感性分析。
2.
the primary ecology of Ahai hydropower station is damaged during the process of thestation s construction.
阿海水电站在建设过程中使原生态受到损害是在所难免的。
4) Allai Khwar hydropower station

阿莱瓦水电站
1.
The Allai Khwar hydropower station is built at where the earthquake frequents.

阿莱瓦水电站工程位于地震频发区,针对"10。
5) Stung Cheay Areng hydropower station

柴阿润水电站
1.
In order to rationally select type and parameters of turbine-generator unit for Stung Cheay Areng hydropower station,a series of schemes are compared,and technical & economic analysis is made based on basic parameters of the station.
为了合理选择柴阿润水电站的机组机型及相关参数,在电站的基本参数的基础上做了一系列的方案比较和技术经济分析论证。