1) blasting measures

爆破措施
3) blasting control measures

控爆措施
1.
Analysis of blasting vibration response of parallel set small clear-distance tunnels and blasting control measures
并设小净距隧道爆破振动响应分析及控爆措施研究
4) measures of blast resistant

抗爆措施
5) Detective Tactics

侦破措施
6) blasting construction

爆破施工
1.
The paper is concerned with the causes of accidents in the process of blasting construction,from which we have learnt a lot.
本文分析了爆破施工过程中安全事故发生的原因,根据国家法律法规和政策规定,提出了完整的爆破施工安全管理体系,该体系对确保爆破施工安全具有一定的指导意义。
2.
This paper introduces the technical principles of the blasting construction, analyzes on several construction plans, and discusses on the design and construction of the damping barrier and the rolling-stone retaining wall.
介绍了爆破施工技术原则,分析了几种施工方案,论述了减震阻隔及防护滚石挡墙设计与施工。
补充资料:不合格品纠正措施(见纠正措施)
不合格品纠正措施(见纠正措施)
corrective actions for nonconforming product:see corrective actions
bul,卯ping jiuzhe叫euoshi不合格品纠正措施(~tive actions for non-印雨皿吨prt泪uct)见纠正措施。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条