2) destructive vibration

破坏性震动
4) damage potential of earthquake ground motion

地震动破坏势
1.
The research of physical measure of seismic intensity is a history and basic subject and the study of damage potential of earthquake ground motion has been worked on for more than one hundred years.
地震烈度物理标准是一个具有悠久历史的基础性的研究课题,由它引发出的地震动破坏势研究也已开展了一百多年。
5) Earthquake Destruction

地震破坏
1.
The simple talk about the compositive measures to reduce the earthquake destruction for building;
浅谈减轻建筑物地震破坏的综合对策
2.
Based on investigation on spot and analysis of earthquake destruction,some countermeasures were suggested in the paper.
通过地震现场调查,对湖北省遭受地震破坏特征和影响情况进行分析,提出了今后的防御对策和建议。
6) earthquake damage

地震破坏
1.
Gradation criterion of earthquake damage to buried pipeline engineering;

地下管线工程地震破坏等级划分标准
2.
The earthquake damage process is displayed and the analysis methods of urban overpass structure may be us.
本文建立了城市立交桥结构地震破坏过程的分析模型,考虑了柱墩、梁、支座的单元模式,推导并建立了行波法输入下结构动力平衡方程,进而研究了地震多点输入下立义桥结构的地震反应问题,建立了立交桥结构的破坏准则,分别对几种方式地震输入下城市立交桥结构的地震反应问题进行了具体研究。
补充资料:240震动机操作规程
1、遵守《铸造设备通用操作规程》有关规定。
2、检查管路系统有天漏气情况和下气缸的升降情况,确定一切正常后,方可进行生产。
3、工作前,先启动通风机和运输皮带,然后再动设备。
4、夹持模组时,一定要对正上下顶杆中心,以免在震动中,模组脱落或飞出。
5、模组夹持好之后,一定要关门震动,不许开门工作。
6、用天车直吊模组时,不许碰撞伐门手柄。
7、发现手柄失灵或的手柄不能移至需要位置时,应先进行检查,不得强力扳动。
8、工作后,先停设备,再停运输皮带和通风机。
9、工作后给震动气缸与夹持气缸加20号机械油,以防气缸与活塞生诱。
2、检查管路系统有天漏气情况和下气缸的升降情况,确定一切正常后,方可进行生产。
3、工作前,先启动通风机和运输皮带,然后再动设备。
4、夹持模组时,一定要对正上下顶杆中心,以免在震动中,模组脱落或飞出。
5、模组夹持好之后,一定要关门震动,不许开门工作。
6、用天车直吊模组时,不许碰撞伐门手柄。
7、发现手柄失灵或的手柄不能移至需要位置时,应先进行检查,不得强力扳动。
8、工作后,先停设备,再停运输皮带和通风机。
9、工作后给震动气缸与夹持气缸加20号机械油,以防气缸与活塞生诱。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条