1) Shertmann J.H. method

施默特曼半经验法
2) Hartmann test

哈特曼检验法
1.
A scanning Hartmann inspection apparatus has been developed on the basis of the traditional Hartmann test principle.
在传统哈特曼检验法基础上研制成功一种扫描型哈特曼检测新装置,可对最大口径为300 mm的聚焦镜在全口径范围内进行采样测量。
3) Semiempirical method

半经验方法
1.
The relationship between bond valence and bond covalency has been investigated by a semiempirical method.
用一种半经验方法研究了固体材料中键电荷与键共价性的关系。
4) semiempirical methods

半经验方法
5) semi-empirical method

半经验方法
1.
This paper analyzes the classification of and the inter-relationship among urban logistics nodes,on the basis of which,a theoretical model and a semi-empirical method concerning the subject are proposed and the spatial layout of logistics nodes in Changzhou is introduced as an illustration.
在分析城市物流结点分类及其关系的基础上,提出了基于城市物流结点布局理论模型与半经验方法的城市物流结点布局规划思路,并以常州市物流结点空间布局为例进行了实证研究。
6) AM1 semiempirical method

AM1半经验方法
补充资料:蒂默特Ⅰ号水电站
蒂默特Ⅰ号水电站
Tumut Ⅰ Hydropower Station
概 述
蒂默特Ⅰ号水电站位于澳大利亚新南威尔士州的蒂默特(Tumut)河上,是雪山工程的1座电站。从蒂默特水库引水发电。混凝土拱坝,最大坝高86.3m,总库容5300万m3,电站总装机容量为32万kW。电站于1955年5月开工,1959年12月全部机组投入运行。
工程主要建筑物包括厂房、压力隧洞与尾水隧洞、调压塔及压力竖井等。围岩为黑云母花岗岩及花岗片麻岩。
蒂默特Ⅰ号水电站为地下式电站,厂房长93.19m,宽约20m,高33.53m。安装间上方设置了2台112/10t高架移动吊车,机房内装有4台8万kW的机组,发电机为立轴凸极式,水轮机为立轴混流式,转速375r/min,额定水头292.6m。总引用流量118.9m3/s。变压器室长38.96m,宽17.07m,高13.72m。距地表面的深度约36.6m。变压器室里装有7台单相充油水冷式变压器,组合成2套三相机组,1台备用。
压力隧洞的长度为2440m,衬砌后为直径6.40m的圆形断面,其输水能力为124.6m3/s。尾水隧洞洞长为1310m。马蹄形断面衬砌前尺寸为8.35×7.77m;衬砌后,尺寸为7.93×7.49m。
压力竖井为双竖井,其单井长度为250m,直径3.66m,分叉后的2条水平管直径为2.44m。每管供1台机组,调压塔为一混凝土塔室,塔顶至隧洞底拱高121.62m,其中竖井81.69m,塔室39.93m,竖井直径为5.49m,上调压室直径为15.24m,尾水调压室直径为6.40m,水平廊道长36.58m。