1) not pressing air to do PM

不压气调相
2) voltage regulation with asymmetry three-phase

不对称三相调压
3) phase and voltage adjustment

调相调压
1.
According to relevant regulations of electric power system and combined with the internal over voltage and insulation coordination study on 500 kV Shaoguan beijiao transmission project,the phase and voltage adjustment calculation and analysis for 500 kV Shaoguan transmission project are carried out.
简要地介绍了广东韶关电网现状及存在电压较高的问题 ,根据电力系统有关规程要求并结合 50 0kV韶关—北郊输变电工程内过电压及绝缘配合研究 ,对 50 0kV韶关输变电工程进行调相调压计算分析 ,在此基础上 ,提出了韶关 50 0kV变电站 1号主变低压侧不需装设容性无功补偿设备 ,但需装设 1 35Mvar的电抗器组 ,主变采用有载调压方式更有利于未来韶关电网电压调整及主变抽头应放于主变较低位置等建议 ,力求为该工程今后的安全运行提供参考。
4) Voltage Regulator with Asymmetric Three-phrase

不对称三相调压器
5) gas phase telomerization

气相调聚
6) phase control pressure adjustment

相控调压
补充资料:压气
1.平息怒气。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条