1) LAIBIN B Power Plant

来宾B电厂
2) Laibin power plant

来宾电厂
1.
A numerical model of thermal discharge from Laibin power plant was researched based on Mike21FM.
应用Mike21FM 2008对来宾电厂温排水的环境影响进行数值模拟,建立了以三角形/四边形混合网格为基础的地形文件,率定了模型参数(糙率和涡粘系数),建立了水动力模型,开展了温排水的数值模拟预测,模拟2种工况(夏季90%枯水和全年90%枯水)条件下的温排水对河流水环境的影响过程,根据模型预测结果可以得出不同温升线包络的范围以及不同河流来水量情况下电厂温排水对河流水环境的影响程度。
3) Nakoso

勿来电厂
1.
The equipments, constitution of the fuel, the combustion system of coal water mixture, operation evaluation of Nakoso No.
从水煤浆的制备、贮存、运输和燃烧等各个方面阐述了日本勿来电厂8号机组燃用水煤浆的实践,着重介绍了8号机组的设备、燃料构成、水煤浆燃烧系统、运行评价。
4) Shajiao B Power Station

沙角B电厂
1.
Test & Analysis of Blended Indonesian Coal Burning in 350 MW Unit Boilers in Shajiao B Power Station;
沙角B电厂350MW机组锅炉掺烧印尼煤试验及分析
5) Laibin

来宾
1.
Late Permian submarine fan turbidites are well developed in the Laibin-Heshan area and are particu-larly well exposed in the Matan and Penglaitan sections along the Hongshui River.
广西来宾蓬莱滩及合山马滩两地的晚二叠世地层中发育有典型的重力流沉积构造,如粒序层理、包卷层理、槽模、重荷模、碟状构造和滑塌褶皱等。
6) Shajiao B Power Plant in Shenzhen

深圳沙角B电厂
补充资料:IGCC电厂(见整体煤气化联合循环电厂)
IGCC电厂(见整体煤气化联合循环电厂)
Aintegrated gasification combined cycle plant
IGCC电厂bined eyele(integrated gasifieationConl一plant)见整体煤气化联合循环电厂。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条