1) beach area between the rivers

滞洪削峰
2) flood peak clipping

削减洪峰
1.
On the basis of the consideration of the distribution of the rainfall concerned,an analysis is made on the effect of the upstream reservoir on the regulation of the design flood and the flood peak clipping for Suofengying Hydropower Station through the calculation of the cascading flood herein.
上游具有一定调蓄能力的水库建成后,将会对洪水产生一定程度的调蓄作用,文中考虑降雨的分布情况,并通过梯级洪水的计算,分析上游水库对索风营电站的设计洪水调节及削减洪峰的影响程度。
3) flood retention and peak reduction

拦洪削峰
4) flood peak delay-time

洪峰滞时
5) flood peak

洪峰
1.
Study on propagration time of flood peak for Liaohe river and its tributarys in Shenyang city area;
辽河及支流洪峰在沈阳境内传播时间研究
2.
Based on the date of Chaohu river network of waterways area 8 survey station of many year materials,The relations between,its flood peak and the year of the largest flood runoff one day is established,its corresponding coefficient of variation Cv value is calculated and the distribution rule and origin of the Cv value is analyzed.
通过对巢湖水系河网区8个测站多年资料,建立其洪峰与年最大一日洪量关系,计算其对应变差系数Cv值。
3.
The Gumbel logistic model is used to describe the dependent structure between the flood peak and flood volume and a bivariate joint distribution of peak-volume using PDS sample approach is developed.
以隔河岩水库坝址洪水研究为例,分析了当洪峰超过其某一频率的设计值时,各不同频率的设计洪量发生的条件频率,并对同频率设计值组合的两变量重现期进行了计算。
6) flood detention

滞洪
1.
The floodplain on the lower Yellow River is of an important place for flood channel,flood detention,desanding and 1.
黄河下游滩区是行洪、滞洪、沉沙和180余万人生活的重要场所,滩区治理模式受到人们广泛关注。
补充资料:滞洪
滞洪
【滞洪】减弱洪峰流量、减轻下游河床负担的措施。通常利用河道附近的湖泊、洼地或预先开辟的滞洪区短期阻滞洪水,或利用河流本身较宽的河床自然滞洪,待洪峰过后,再将滞洪区的积水放归本河下游。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条