1)  half-station instrument
					 
	
					
				
				 
	
					
				半站仪
				1.
					Through the practice of the setting-out for the pier of a bridge, this paper points out that the setting-out of the foundation pile points by using the notebook computer matched with the half-station instrument can simplify the complicated calculation, shorten the working period, and increase the operating efficiency.
						
						通过对某大桥桥墩的放样实践,提出应用笔记本电脑配合半站仪放样测量,可以达到简化复杂计算,缩短作业时间,提高作业效率的目的。
					
					2)  semi-total station distance theodolite
					 
	
					
				
				 
	
					
				半站型测距经纬仪
			
					4)  total station instrument
					 
	
					
				
				 
	
					
				全站仪
				1.
					Accurate analysis of total station instrument to replace leveling survey;
					 
					
						
						 
					
						全站仪代替水准测量精度分析
					2.
					The use of control surveying in the mine area ground with GPS and total station instrument;
						
						GPS结合全站仪在矿山地面控制测量中的应用
					3.
					Discussion on the new methods of total station instrument height measurement;
					 
					
						
						 
					
						全站仪高程测量的新方法探讨
					
					5)  Electronic Total Station
					 
	
					
				
				 
	
					
				全站仪
				1.
					Data Communication from Electronic Total Station to EPSW2003;
					 
					
						
						 
					
						EPSW2003与全站仪的数据通讯
					2.
					To Achieve Communications between AutoCAD and Electronic Total Station with VBA Technology;
						
						用VBA技术实现全站仪和AutoCAD通讯
					3.
					Wireless Data Communication between Electronic Total Station and External Computer;
					 
					
						
						 
					
						全站仪与微机之间的无线数据通信
					
					6)  total station
					 
	
					
				
				 
	
					
				全站仪
				1.
					Application of total station in the three-dimension similitude simulation test on mining subsidence;
						
						全站仪在开采沉陷三维相似模拟实验中的应用
					2.
					Application of total station to calibration of hydrological cable-way;
					 
					
						
						 
					
						全站仪在水文缆道率定上的应用
					3.
					Method of quickly surveying to cross section with total station and the design of system function;
						
						全站仪快速横断面测量方法与系统设计
					补充资料:露天矿半固定破碎站
		露天矿半固定破碎站
semi-stationary crushing plant in open-pit
设费用及带式输送机延伸费用之和,元;C、C:分别为汽车和带式输送机折算的矿岩每垂直提升lm的费用,元/t·m,按下式计算亡、f:: 子-一_AK — l()O()s,na A 1()()Osln声A:、八:分别为汽车和带式输送机的矿岩运输费用·兀1·km;a、召分别为汽车运输坑线和带式输送机道的坡度,(“);K为汽车运输坑线展长系数;了为矿岩平均容重,t一m污;犷为矿岩量,m只。计算求得的移设垂直跟离.再按台阶高度的整数合理确定之 在分期开采情况下,应根据采场所能提供的空间部位和分期境界过渡到能适应正常采掘关系,对基建投资、移设所承担矿岩量的经营费用、施工_进度等.采用“综合费用分析比较法”确定,移设步趾应与分期环采协调一致。 半固定破碎站一般每隔3一乃个台阶移设」次,或每移设一次的服务年限一般为5~6年或更长 (张延忠)lut一onkuong bongud一ng Pos日l之hon露天矿半固定破碎站(、emi一sta,ionary crush-ing plant in open一pit)随采场的延深而间隔一定时间向下移设的破碎站一半固定破碎站‘般设置于采场的最终边帮上可缩短采场汽车的运距、降低运输费用、但需投人移设破碎站和延伸带式运输设备的延伸费用。合理的移设步距‘沿延深方向的垂直距离).应以汽车与带式输送机两种方式对下层矿岩运输费用的差额,等于破碎站移设费以及带式输送机延伸费之和,作为确定的依据一般可按下式确定: I了一一典只一 (亡、一C)了V式中11为破碎站移设的垂直距离,m;C为破碎站移
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
	参考词条