说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 临时连续
1)  temporary continuation
临时连续
2)  critical continuous mode
临界连续
3)  temporary connection
临时连接
1.
Temporary Connection of Continuous Girders with Rigid-framed Structure of the Second Changjiang River Bridge in Wuhan;
武汉长江二桥连续梁与刚构的临时连接
2.
It also introduces some new construction technologies such as the temporary connection of adapters and the closing up of the whole articulations through welding.
通过工程实例 ,介绍秭归青干河大桥钢管拱吊装施工独特的施工方案与新型的施工控制方法及接头辅助临时连接、整体节段同时一次焊接合龙等施工新技术的应用及探讨。
3.
Stiffening girder sections of suspension bridge are often connected each other by temporary connection during the construction.
在悬索桥加劲梁的吊装过程中,梁段之间一般采用临时连接来进行安装。
4)  continuous time
连续时间
1.
Firstly,a novel mixed integer nonlinear programming(MINLP) formulation based on continuous time representation,is presented in this paper.
采用连续时间建模方法,建立了一种新的汽油非线性调合和调度集成优化的混合整数非线性规划(MIN-LP)模型,克服了当前在油品调合调度中采用线性调合模型或者将非线性调合过程和调度分开优化的缺陷。
2.
Ant colony algorithm was introduced into continuous time production planning optimization.
针对连续时间生产计划问题,在生产速率、需求率和库存水平等都确定的前提下建立相应的数学模型,并将蚁群算法引入到连续时间生产计划的优化中,利用蚁群算法的自适应、全局优化、并行分布式处理等特性在整个生产计划的可行解中寻找最优解。
3.
In order to deal with batching problem in actual production,a mixed integer linear programming model of continuous time was proposed for short term scheduling of multi-product single-stage batch plant with parallel lines.
为解决实际计划需求的分批问题,提出了一种新颖的单阶段并行机多产品厂短期调度连续时间混合整数规划模型,该模型可同时处理需求分批与批次调度任务,而且考虑了顺序相关的产品转换时间。
5)  Time Continuous
时间连续
6)  continuous-time
连续时间
1.
To the problem of optimal control for continuous-time nonlinear systems with delays,a novel control algorithm of linear time-delay model based on dynamic system optimization and parameter estimation was presented.
为了研究非线性连续时间时滞系统最优控制问题,提出了一种基于线性时滞模型的动态系统优化与参数估计的新的最优控制算法,在模型与实际存在差异的情况下,该算法通过迭代求解线性时滞最优控制问题和参数估计问题,给出了原问题的最优解。
2.
Illuminated by a real design case,an architecture design method of high resolution multi-bit continuous-time Sigma-Delta modulator is presented.
介绍了高性能连续时间Sigma-Delta调制器的系统设计和行为级建模的方法,并通过在噪声整形滤波器中加入一对零点改善了调制器带内信噪比。
3.
In the paper a continuous-time mean-variance portfolio selection model with liability is established.
构造了一个带外生负债的连续时间均值-方差最优投资组合选择模型。
补充资料:关于临时建设和临时用地

临时建设是指必须限期拆除、结构简易、临时性的建筑物、构筑物、道路、管线或其他设施;临时用地是指由于建设工程施工、堆料或其他原因,需要临时使用并限期收回的土地。批准临时建设和临时用地的使用期限,一般均不超过两年。
临时建设和临时用地都对城市规划的实施产生重要的影响,因此,城市规划行政主管部门必须对城市规划区内的临时建设和临时用地进行严格的规划管理。任何单位和个人需要在城市规划区内临时使用土地或进行临时建设都应当征得城市规划行政主管部门的同意,不得影响城市规划的实施。
鉴于临时建设和临时用地的情况比较复杂,各地的管理体制和管理条件又不尽相同,因此,《城市规划法》第三十三条规定:“在城市规划区内进行临时建设,必须在批准的使用期限内拆除。临时建设和临时用地具体规划管理办法由省、自治区、直辖市人民政府制定。”
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条