1) dam concrete
主坝混凝土
1.
Crack and deficit treatment of dam concrete for Lijiaxia hydropower station;
李家峡水电站主坝混凝土裂缝及缺陷处理
2) the main rolled concrete dam
碾压混凝土主坝
1.
In view of the inner observation design of the main rolled concrete dam of the Baise multi-purpose dam project, determined the important observation section for safe observation, discussed the dam foundation deformation monitoring, crack and pressure monitoring, etc.
针对百色碾压混凝土主坝的内部观测设计,从安全监测设计的总原则出发,确定重点监测断面,并阐述了6A#坝块的坝基变形监测、裂缝监测、总压力监测、应力应变监测、渗压监测、温度监测,通过近期的施工期观测资料表明,目前埋设的所有观测仪器均处于正常工作状态,同时指出施工中应注意的问题。
3) Concrete dam
混凝土坝
1.
Some problems about《Technique criterion of the concrete dam safety monitoring》;
关于《混凝土坝安全监测技术规范》的若干问题
2.
Integral seismic response analysis of concrete dam and powerhouse at dam toe;
混凝土坝及坝后式厂房整体地震响应分析
4) Concrete dams
混凝土坝
1.
Analysis of Leakage Harmful to concrete dams and its treatment;
混凝土坝坝体渗漏危害性分析及其处理
2.
Research on influence of sediment plasticity on seismic response of concrete dams
淤沙的塑性性质对混凝土坝地震反应的影响研究
3.
Concrete dams are the most important part of hydraulie structure,which safety directly determines the safety of the whole hub.
文章主要从水工建筑物的运行、巡视检查和维护管理等三个方面论述如何进行混凝土坝水工建筑物的维护管理。
6) Concrete arch dam
混凝土拱坝
1.
Risk analysis of construction progress of large concrete arch dam;
大型混凝土拱坝施工进度风险分析
2.
Reliability index calculation of concrete arch dam by a combined stochastic FEM and maximum entropy method;
随机有限元与最大熵法联合求混凝土拱坝可靠度
3.
Linear cracking stochastic analysis and nonlinear intension analysis of concrete arch dams;
混凝土拱坝线性开裂随机分析与非线性强度分析
补充资料:福建省第二座碾压混凝土坝——龙门滩一级水库
福建省第二座碾压混凝土坝——龙门滩一级水库
目 福建省第二座碾压混凝土坝— 龙门滩一级水库
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条