说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 马湖抽水蓄能电站
1)  Mahu Pumped Storage Hydroplant
马湖抽水蓄能电站
1.
The authors present the current condition and problems arised in development of Sichuan power system and set an example of Mahu Pumped Storage Hydroplant.
本文通过时四川电力系统的现状及发展中存在问题的分析,并以马湖抽水蓄能电站为例,分析其对电力系统“吸丰补枯”和汛期“调峰填谷”的作用。
2)  pumped-storage hydroelectric plant
抽水蓄能水电站
3)  pumped storage power station
抽水蓄能电站
1.
Research on preloading filling spiral case structure in large pumped storage power station;
大型抽水蓄能电站充水保压蜗壳结构分析
2.
Study of three-part electricity price with consideration of dynamic assistant service of pumped storage power stations;
考虑抽水蓄能电站动态辅助服务的三部制电价研究
3.
The Application of KKS Identification System in Tai an Pumped Storage Power Station;
KKS标识系统在泰安抽水蓄能电站的应用
4)  pumped-storage power station
抽水蓄能电站
1.
3-D numerical simulation of seepage in the upper reservoir of the Pushihe pumped-storage power station;
蒲石河抽水蓄能电站上库三维渗流数值模拟
2.
All-round simulation training systems for pumped-storage power stations;
抽水蓄能电站全范围仿真培训系统
3.
Price mechanims and operation modes for current pumped-storage power stations;
现有抽水蓄能电站电价机制及经营模式的探究
5)  pumped storage plant
抽水蓄能电站
1.
Study on self-excited vibration of hydro-mechanical system in pumped storage plants;
抽水蓄能电站水力-机械系统自激振动特性研究
2.
Numerical simulation of trash rack for a pumped storage plant;
抽水蓄能电站进/出水口拦污栅数值模拟
3.
3-D numerical simulation on the vertical pipe outlet of pumped storage plant;
抽水蓄能电站竖井式出水口三维数据模拟
6)  pumped storage power plant
抽水蓄能电站
1.
Some discussions about operational modes of pumped storage power plants under the electric power market;
电力市场环境下抽水蓄能电站经营模式的探索
2.
Operation modes of pumped storage power plant and the economic benefit analysis of power network;
抽水蓄能电站运行方式和电网经济效益分析
3.
The electricity benefits of pumped storage power plant;
抽水蓄能电站的电量效益
补充资料:巴斯康蒂抽水蓄能电站
巴斯康蒂抽水蓄能电站
Bath County Pumped Storage Power Station

    位于美国弗吉尼亚州西北部,20世纪80年代是世界上装机容量最大的抽水蓄能电站。装机容量210万千瓦。厂房为半地下式,发电设计水头329米,抽水设计扬程335米,抽水最大流量 116米3/秒。上水库土石坝最大坝高140米 ,坝顶长731米。总库容4400万米3。下水库土石坝最大坝高41米,坝顶长690米,总库容3760万米 3。引水系统包括岸坡式取水口、引水平洞、竖井、压力隧洞、压力钢管和调压井等 。工程于1975年开工,1985年投产。
    
   

电站内景

电站内景

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条