1) Guantiing and Miyun reservoir
官厅密云水库
2) Guanting Reservoir
官厅水库
1.
Spacial Variation and Eco-Environmental Risk of Heavy Metals in Soil Surrounding Guanting Reservoir;
官厅水库周边土壤重金属空间变异特征及风险分析
2.
Employing remote sensing to analyze non-point source pollution problems in riparian buffer strips of guanting reservoir;
官厅水库库滨带非点源污染控制效应的遥感分析
3.
Trend analysis of water quality of Guanting Reservoir and measures;
官厅水库水质趋势分析及对策研究
3) Guanting Reservoir inflow
官厅水库入库水
1.
A feasibility study was conducted for treating Guanting Reservoir inflow by using bio-filters.
进行了生物滤池系统在低温下对官厅水库入库水生物预处理可行性研究。
5) Guanting reservoir and its around zone
官厅水库及邻区
1.
Secondly,building module and earthquake trend forecast of earthquake activity are be analyzed by the fuzzy Modular neural network method in Guanting reservoir and its around zone.
首先介绍了模糊Modular神经网络的原理、建模方法与仿真实验,然后利用该方法把一些常用的地震学指标作为神经网络的输入,未来50年最大震级则作为网络的期望输出,对官厅水库及邻区的地震活动进行学习与最大震级序列建模,进行危险性预测。
6) Guanting reservoir watershed
官厅水库流域
1.
Estimation of sediment reduction by water and soil conservation of Guanting reservoir watershed in recent twenty years;
近廿年来官厅水库流域水土保持拦沙量估算
补充资料:密云水库
| 密云水库 中国北京市郊的水库。具有防洪、城市供水、灌溉、发电等综合效益。库区位于密云县境,跨越潮、白两河,低水时分成潮河与白河两库 , 高水时合二为一 。控制流域面积15788平方千米,水库总库容 43.75 亿立方米 。库区岩层均系片麻岩。1958年9月开工,1960年9月基本建成 ,1976年7月28日唐山地震后又进行了加固和扩建。密云水库的主要建筑物有:①白河、潮河2座主坝和5座副坝,主坝均为粘土斜墙土坝,最大坝高分别为66.4米和56米,白河主坝砂砾石覆盖层最大深度44米,在国内首次采用 0.8米厚的混凝土防渗墙,主副坝总长4559.5米,坝体填筑量2268万立方米 。②3座溢洪道,总泄量为15520立方米/秒。③5条泄水隧洞,总泄量为1848立方米/秒。④白河电站和潮河电站,分别装机6台和2台,总装机容量8.8万千瓦。
|
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条
