1) cucumber production
黄瓜生产
1.
With cucumber as the major research material, the status of pesticide residues in cucumber production in China was reviewed in this paper.
黄瓜为主要研究对象,回顾我国黄瓜生产中农药污染的现状,遵循危害分析和关键控制点原理,分析我国黄瓜生产中的农药危害和关键控制点,建立农药风险指数评价技术,评价农药控制效果,提出农药应用监控技术,构建我国黄瓜生产中农药应用过程控制体系的框架。
2) Cucumber yield
黄瓜产量
1.
According to the constituent elements of cucumber yield to focus on the election, scientific fertilization, to ensure the effective number of plants per unit area, plant a few fruit setting, pollination quality, timely control of diseases and pests, changes in the latter half of the fertilizer management, harvesting, such as an important link in a timely manner.
根据黄瓜产量的构成因素突出抓好选地,科学施肥,确保单位面积有效株数,单株坐瓜数,授粉质量,及时防治病虫害,改变中后期的肥水管理,适时收获等重要环节。
3) cucumbers growth
黄瓜生长
1.
As a result,this experiment introduces the technique of PGPR strain resources,using cucumbers as the research materials,to investigate the effect of PGPR to the cucumbers growth.
本试验引进PGPR菌种资源技术,以黄瓜的生长为研究对象,探究了促生根际菌(PGPR)对黄瓜生长的影响。
4) dwarf cucumber
矮生黄瓜
5) wild cucumber (Sicyos angulatus L.)
野生黄瓜(棘瓜)
6) Cucumbers. Cucumbers.
黄瓜。黄瓜。
补充资料:JIT准时制生产(及时制生产)
JIT准时制生产(及时制生产):是应用拉引式生产物流控制原理的方法。在生产系统中任何两个相邻工序即上下工序之间都是供需关系,如何处理这种关系,就是生产物流所要研究的问题。按照传统的生产计划组织生产(包括MRP),物料根据预定的计划时间由供方向需方逐个工序流动。需求方根据上一工序送来物料的数量和到达时间进一步加工。需求方接受物料完全是被动的,如果出现不可预料的因素,物料可能提前或延迟到达。延迟到达将使生产中断,必须在生产计划中留有余地,以避免这种现象的发生。这样一来,必然存在或多或少、提前到达的现象,从而导致系统中库存量的上升,产生种种库存多余的弊病。JIT的方法改变了传统的思路,由需方起主导作用,需方决定供应物料的品种、数量、到达时间和地点。供方只能按需方的指令(一般用看板)供应物料。送到的物料必须保证质量,无残次品。这种思想就是以需定供,可以大大提高工作效率与经济效益。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条