1)  dug-well base
挖井
1.
If a well is dug vertically and a concrete for the dug-well base on drier cohesive soils or loess ground is poured in place, the basets vertical and level bearing capacity is larger than the other types.
在较干硬粘土和黄土地基采用竖直开挖井孔就地灌注混凝土的挖井基础,竖向和水平承载力都较其它类型基础大,施工简单,效益较好,挖井基础周面与地基土能产生很大的水平摩阻力,结合原位黄土地基大比例模型试验分析了水平摩阻力随位移变化发挥作用的规律,提出了基础水平摩阻承载力的计算模式。
2)  make full use of veteran oil wells
老井挖潜
3)  Inclined shaft excavation
斜井开挖
1.
Safety management of inclined shaft excavation was the whole process for safety production supervision,examination management and security control in the construction.
在抽水蓄能电站中斜井开挖施工历来是一个难点。
4)  shaft excavation
竖井开挖
1.
The effective performance of grouting is an important keypoint for a successful shaft excavation.
地下水影响竖井开挖工作甚巨,竖井开挖成败除了地质因素外,有效之止水灌浆工作亦为主要关键。
5)  excavation of cylinder
沉井开挖
1.
Combined with engineering of cylinder type sewage reservoir, it introduces construction process and method of major procedure of cylinder type sewage reservoir, which including fabrication of cylinder、excavation of cylinder、sealing of cylinder, security measures are putted forward to ensure quality reaching standard.
结合某污水处理池工程实践,介绍了污水池沉井制作、沉井开挖、沉井封底等主要工序的施工程序及施工方法,并提出了施工安全措施,从而使工程质量达到设计及规范要求。
6)  excavation expansion of inclined well
斜井扩挖
补充资料:白银有色金属公司深部铜矿主井和副井


白银有色金属公司深部铜矿主井和副井


白银有色金属公司深部铜矿主井和副井