说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 成本金分解计划(CFDP)
1)  Cost Funds Dividing Plan (CFDP)
成本金分解计划(CFDP)
2)  retirement benefit plan costs
退休金计划成本
3)  planned distribution
计划成本分配法
4)  process costing
分步成本计划(法)
5)  cost plan
成本计划
1.
Compilation and management on running cost plan for hydraulic construction enterprise;
水利施工企业成本计划的编制与管理
2.
Research on the Integration Model of Cost Plans and Cost Funds Dividing Plans in Large Scale Discrete Enterprises;
离散制造企业成本计划与成本金分解计划集成控制模式研究
3.
Analysis on the control of enterprises’ cost plan
浅析施工企业成本计划的控制
6)  cost planning
成本计划
1.
As an important part of cost management,cost planning is more and more important.
而成本计划,作为成本管理的重要组成部分,其重要性也就日益突显出来。
2.
The article illustrates the importance of cost control in overall process of engineering construction,introduces the inventory of budge engineering cost planning and its implementing elements,and discusses the method and requirement of cost control,in order to increase the profit of enterprise and to ensure its invincible position in the market.
阐述了成本控制在工程施工全过程中的重要性,介绍了预算工程成本计划的编制以及计划实施要点,论述了成本控制方法及要求,以提高企业利润,保证企业在市场中立于不败之地。
补充资料:计划分解


计划分解


【计划分解】一种利用原始数据本身所具备的统计特性,确定下年度各个月(季)份计划监测目标的技术。‘具体步骤:①利用季节调整软件xll对原始数据进行处理,获得原始数据的季节因子乳②假设经济现象以r稳定增长,利用下式取得下年度相应的各月(季)的初步监测数Q,十‘。(1+r。=浑(1) Q.十,=(l+r),Q‘(2)然后利用(3)式得到实际的计划分解监测数据Q犷’。 喘,=居“·Sj(3)式中,n二4时表示季度数据;n=12时表示月度数据;r为年内逐月(季)的增长率;t表示基年;j表示需监测的月(季);j=1,2,3,4(季)或j=l,2,…,12(月);p表示指标为最后的监测目标。 计划分解对于监测实际经济运行过程,调整并执行宏观经济政策使之达到预定目标是必不可少的。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条