1) inclined experiment

斜面实验
2) Galilean obliquity experiment

伽利略斜面实验
3) oblique board test

斜板实验
1.
The general observation was made at the different time points,the oblique board test was done and the CR cards were observed after the operation.
造模术后不同时间点分别进行大体观察、斜板实验及CR片观察。
4) slope compaction

斜面压实
1.
In situ engineering tests on MSW slope compaction effects at Xiaping sanitary landfill in Shenzhen;
填埋场垃圾堆体斜面压实工程试验研究
5) Rivlin'oblique plate

Rivlin斜板实验
6) baroclinic wave test

斜压波实验
1.
By an idealized baroclinic wave test, we compare the ability of different time differencing methods for keeping initial steady-state, and it shows that the second-order Runge-Kutta method has lower error norm.
通过斜压波实验比较不同格式在保持初值稳定性上的表现,从而发现,二阶Runge-Kutta方案能够更好的保证方案的初值稳定性。
补充资料:保险商实验室安全标准(见保险商实验室)
保险商实验室安全标准(见保险商实验室)
safety standards of UL: see Underwriters Laboratories; UL
Baoxianshang Sh啊nshi anquan bicozhun保险商实验室安全标准(saJ七ty stand助dsofUL)见保险商实脸室。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条