1) Guangzhou metro project

广州地铁工程
1.
This article gives an introduction to the determination of unit price or lump sum price for a couple of Bill items such as excavation and backfill of earth/rock work,compensation for self-geneation of power,temporary houses and installations and the station main body enclosure structure in bidding for the Guangzhou metro project.
简要就广州地铁工程项目在投标报价中的土石方开挖及回填、自发电补差、临时房屋及设施、车站主体围护结构几个清单项目单价或合价的确定做一介绍,为在较低总价中标时,尽量减少合同风险提供一点可能的参考。
2) Guangzhou Metro

广州地铁
1.
Analysis of the Soft Ground Treatment in Guangzhou Metro Line 2;

广州地铁2号线大面积软土地基处理监测分析
2.
A Comment on the English Translations of the Chinese Signs in the Guangzhou Metro Stations;
试评广州地铁站汉语标示的英译
3.
The Feasibility of Applying the Returning Airflow and Exhausting Airflow to Cool the Cooling Water in the Air Conditioning and Ventilation System of Guangzhou Metro station;
回/排风在广州地铁中央空调冷却水系统中的工程应用前景
3) Guangzhou subway

广州地铁
1.
The geological condition of Line 3 of Guangzhou subway is rather complicated.

广州地铁3号线[汉—市]区间的地质条件复杂,盾构不仅要在硬塑残积土中长距离掘进,又要穿过坚硬的微风化混合岩、辉绿岩等混合地层,因此盾构机的开挖系统(尤其是刀盘)的设计非常关键。
2.
Freezing curtain was adopted for the turn-back track construction at Tianhe Station of Guangzhou subway, where the records of horizontal drilling distance(>100 m)and freezing profile(with diameter>10 m)had not been reported yet both in China and abroad.
广州地铁天河客运站站后折返线采用矿山法冻结帷幕施工,即“水平孔冻结加固土体,隧道内开挖构筑”的施工方法,水平超长距(大于100m)、大断面(直径大于10m),在国内、外均无此工程记录。
3.
Special strata were encountered in shield driving on Guangzhou subway Lines 3 and 5.

结合广州地区地质复合型特点,分析广州地铁3、5号线盾构掘进施工中遇到的特殊地质现象,说明重视盾构在特殊地质地段的施工是保证盾构顺利掘进的关键,重点阐述盾构在富水断裂带、石英含量高的硬岩、孤石、风化深槽、煤气层、岩溶空洞等特殊地质段采取的掘进施工方法。
4) Guangzhou Metro line 1

广州地铁一号线
1.
Design Ideas of the Door Control System of Passenger Car in Guangzhou Metro Line 1;

广州地铁一号线车辆客室车门控制系统的设计
2.
Objective To find out the level of radiation and effective dose of workers in Guangzhou Metro line 1.
目的了解广州地铁一号线放射性水平及所致工作人员有效剂量。
5) Guangzhou Metro Line 3

广州地铁三号线
1.
Train control analysis of 3-cars train and 6-cars coupled train for Guangzhou Metro Line 3;
广州地铁三号线车辆3节与6节编组的列车控制分析
2.
Analysis and controlling measures on emulsion of air compressor oil for Guangzhou Metro Line 3 vehicles;
广州地铁三号线车辆空压机油乳化原因分析及对策
6) Guangzhou metro line 6

广州地铁6号线
1.
Guangzhou metro line 6 passes through the old city zone, so there are many control factors for tunnel ventilation design.
广州地铁6号线穿越老城区,因此隧道通风设计的控制因素较多。
补充资料:坦克维修工程车(见坦克保养工程车、坦克修理工程车)
坦克维修工程车(见坦克保养工程车、坦克修理工程车)
tank maintenance %26 repair vehicle
一““、、’v‘丈人1以gUflgCnengChe坦克维修工程车(:artk Inaintenane。%26repair vehicle)装有坦克维修设备、仪器、工具的技术保障车辆。见坦克保养工程车、坦克修理工程车。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条