1) supporting mechanism of the pay off
放线架支撑机构
1.
A design method employing “unloading mechanism” for the manufacture of he supporting mechanism of the pay off for cage stranders is presented.
本文阐述了在笼式绞线机放线架支撑机构的设计中采用“卸荷机构”的方法 ,文章亦对其它一些改进设计作了简要介绍。
2) cable drum table
卷放电缆支撑架
3) bus enclosure and support structure
母线外壳和支撑机构
4) steel braced-frame structure
钢支撑-框架结构
1.
In order to realize simulated seismic test of large complex steel braced-frame structure at shaking table,regarded main plant structure of some active service large thermal power plant as prototype and according to equivalent principle of structural static and dynamic property,the whole large scale shaking table test model was designed and made.
为了在振动台上实现大型复杂钢支撑-框架结构的模拟地震试验,以某现役大型火电厂主厂房结构为原型,根据结构静、动力性能等效原则,设计制作了大缩比振动台试验整体模型。
5) Braced Frame Structure
框架-支撑结构
1.
The braced frame structure with dampers in power plant was analyzed with non - linear static procedure ( Pushover).
用非线性静力分析方法(Pushover)对设置减震装置的火电厂框架-支撑结构进行了分析计算。
补充资料:放线验线应注意哪些事项
放线验线时应注意以下五点注意事项:
1、先放线后验线。应当坚持先放线后验线的程序。一般建设工程项目可按照周围的参照物,由施工单位放线,施工放线后,建设单位向城市规划行政主管部门申请验线并报形式日期,城市规划行政主管部门的管理人员到现场验门的勘测队伍进行放线,放线后经规划管理人员验线。
2、作好放线验线记录。无论由谁放线、验线、都必须作好放线、验线记录。
3、在放线的过程中,对验线时需要查验的关键点必须打上固定标志。
4、放线时,原地上需要拆除的建筑物、构筑物应当全部拆除掉。
5、地形复杂的用地,应平整后再放线。