1) altering engineering

变更工程
1.
Controlling the altering engineering that means to control the cost of engineering basically.
阐述了控制变更工程 ,即从根本上控制工程造价 ,分析变更工程的产生及对工程造价的影响 ,从而减少在工程决策阶段的影
2) project change

工程变更
1.
The application & practice of management in systematic procedural project changes;

制度化程序化工程变更管理的应用与实践
2.
Contract management of project changes of Shuiyu reservoir s danger removing and strengthening work;
水峪水库除险加固工程变更的经济分析
3.
The influencing of project changes in cost management;

工程变更在造价管理中的影响
3) engineering change

工程变更
1.
On the management of the engineering change based on the engineering quantity list valuation mode;
论清单计价模式下工程变更的管理
2.
How to deal with the accounts settling of engineering changed items by chartered estimation engineers;
造价工程师如何处理工程变更中的结算问题
3.
Discussion on the method of supervision engineer treating engineering change;

关于监理工程师处理工程变更的方法探讨
4) engineering alteration

工程变更
1.
Reflection on claims from engineering alteration;

对工程变更进行索赔的思考
2.
Combined with engineering practice, the supervision experience in the implementation of FIDIC clause in Handan water supply project was introduced in aspects of payment of engineering fees, disposal method of engineering alteration, and claim for compensation.
结合工程实践,从工程款的支付、工程变更的处理以及索赔事件的处理三方面,介绍了邯郸供水项目中实施FIDIC条款的监理经验。
3.
In this paper,how to determine alteration unit price is explored by analyzing the causes of engineering alteration and adjustment of engineering amount.
工程变更在工程实施过程中普遍存在,变更费用的多少直接关系到业主和承包商的切身利益,而变更费用的重点在于变更单价。
5) project changes

工程变更
1.
Importance of project changes in project settlement;

浅谈工程变更在工程结算中的重要性
2.
The contents application and endorsement process of project changes;

试论工程变更的内容及申报审批的程序
6) project variation

工程变更
1.
According to the property of project variation,the paper divides variation into fatal variation,important variation and general variation,and points out that we can control variation effectively by establishing.
首先依据工程变更内容将工程变更划分为工作范围变更、施工条件变更、设计变更、施工变更和技术标准变更,对不同内容的变更区别情况提出不同控制方法。
2.
To strengthen the active control of architectural engineering construction cost,and reduces the project variation visa during the project construction stage as far as possible,and guarantee the project settlement price does not surpass the investment plan volume which confirmed,and speed up the rate of project settlement progress.
为了加强对建筑工程造价的有效控制,尽量减少工程施工阶段工程变更签证,保证工程结算价不超过即定的投资计划额,同时加快工程结算进度。
补充资料:坦克维修工程车(见坦克保养工程车、坦克修理工程车)
坦克维修工程车(见坦克保养工程车、坦克修理工程车)
tank maintenance %26 repair vehicle
一““、、’v‘丈人1以gUflgCnengChe坦克维修工程车(:artk Inaintenane。%26repair vehicle)装有坦克维修设备、仪器、工具的技术保障车辆。见坦克保养工程车、坦克修理工程车。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条