1) cycle of survey
勘测周期
2) survey and repair cycle
勘测与修葺周期
3) Collate checing cycle
勘查周期
4) exploration cycle
勘探周期
5) early-stage reconnaissance and design
前期勘测
6) preliminary investigation
初期勘测
补充资料:勘测设计周期定额
勘测设计周期定额
period quota of investigation and design
kanee sheji zhouql ding’e勘侧设计周期定额stigation and design)(peried quota of inve-见勘浏设计工日定倾。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条