1) conic specimen for pullout test

锥面拔出试件
2) tap extractor

丝锥拔出器
3) pull-out test

拔出试验
1.
The relation between bond and slip of CFRP tendons and concrete structure were investigated and the bond destruction mechanism was analized by pull-out test.
通过拔出试验,研究了碳纤维筋与混凝土结构的粘结与滑移关系,分析了粘结破坏的机理。
2.
In this paper,the bond strength between high-strength lightweight concrete and deformed bar was studied with 80 axial pull-out tests.
通过80个拔出试验,探讨了变形钢筋与高强陶粒混凝土的粘结锚固强度,并与普通混凝土和低强度陶粒混凝土的试验结果进行了比较。
4) Pullout test

拔出试验
1.
On the basis of the pullout test data, the position functions that reflected the bond slip relationship varying with the different positions were proposed.
为了正确揭示钢筋与混凝土的粘结本构关系,本文首先从理论上推导了钢筋应力σs、钢筋与混凝土的粘结应力τ以及钢筋与混凝土的相对滑移s的解析表达式,并根据拔出试验数据,给出了随不同位置变化的钢筋与混凝土粘结应力和相对滑移关系,推导了反应这种变化规律的位置函数。
5) Cone-Anvil Stretching

锥面砧拔长
6) pull-out specimen

拉拔试件
1.
Experimental studies were performed on 12 pull-out specimens to investigate the bond-slip characteristics,loading process,failure mode,failure mechanism,bond strength,and anchorage length of GFRP rebar in concrete C15.
基于12个拉拔试件的黏结试验,对GFRP筋与C15混凝土之间的黏结滑移特性、受力过程、破坏形态、破坏机理、黏结强度以及锚固长度等进行了研究。
补充资料:拔不出腿
1.比喻事情繁忙,摆脱不开。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条