1) design of sedimentation tank
沉淀池设计
2) settling tank
沉淀池
1.
Simulation and control of sludge blanket height in settling tanks;
沉淀池污泥层高度的模拟与控制
2.
Reynolds number of water flow in horizontal flow settling tank is above 3 000,and it is called turbulent flow.
平流式沉淀池内水流的雷诺数>3 000(为紊流),当利用传统的层流模型进行模拟时不能准确获得沉淀池内的流速场分布,若采用特征涡粘性雷诺数或密布网格,则可以扩展层流模型模拟沉淀池内物理量的适用性。
3.
The settling tank cost model is established by using it.
运用BP网络的非线性函数逼近功能,以沉淀池的计算表面积与计算体积为网络的输入,沉淀池的费用值为网络的输出,建立单体构筑物沉淀池的费用模型。
3) Settler
[英]['setlə(r)] [美]['sɛtlɚ]
沉淀池
1.
Settling mechanism and influencing factors on matte droplets in settler slag of copper flash smelting furnace;
铜闪速炉沉淀池渣中锍液滴沉降机理及其影响因素
2.
To counter the problems in discharge of sludge from settlers, a new type perforated pipe with divergent tube is developed.
针对沉淀池排泥过程中所存在的问题 ,研制了一种新型的排泥装置———扩张管嘴排泥管。
3.
A one-dimensional(1D) layered and hydraulic settler model with Takács settling velocity model was constructed by the incorporation of dispersion item and density current.
通过在沉淀池一维分层模型中纳入弥散项和异重流,建立沉淀池一维分层水力模型,并选用Takács模型描述沉淀池中悬浮固体的沉降速率。
4) sedimentation tank
沉淀池
1.
Numerical modeling on the movement of water and SS in two-dimensional sedimentation tanks of sewage factory.;
污水厂二维沉淀池水流和悬浮物运动数值模拟
2.
The design of PLC-based autocontrol system applicable to sludge water dischargers for sedimentation tanks in waterworks;
自来水厂沉淀池排泥装置PLC自控系统设计
3.
Practice to reduce the turbidity of outlet water by increasing the length of sedimentation tank catch basin;
加长沉淀池集水槽降低出水浊度的实践
5) Sedimentation basin
沉淀池
1.
Improvement of sedimentation effect by laying of short-tube filling in sedimentation basins;
短管填料对沉淀池沉淀效果的改进
2.
In this article, authors introduce construction methods of a 50m diameter sedimentation basin and the new two-time tension technique adopted to prestressed wall concrete, and provide experiences to avoiding temperature and shrinking cracks on walls which can be referred to construction of similar preedstressed projects.
介绍了50m直径沉淀池施工工艺和池壁预应力混凝土采用二次张拉新技术,为防止施工过程中池壁产生温度和收缩裂缝提供了经验,可供同类型预应力工程施工参考。
6) precipitating tank
沉淀池
1.
Design and approach on sump and precipitating tank upward and downward mining area;
上下山开采采区下部水仓及沉淀池设计探讨
2.
During manufacturing in cogging workshop,it produces a lot of oxide filing, these filings get into precipitating tank through the channel.
开坯车间生产过程中产生大量氧化铁皮,这些铁皮通过冲渣沟进入沉淀池。
补充资料:铁皮沉淀池设计
铁皮沉淀池设计
design of scale pit
t ieP一ehend一aneh}sheJ-铁皮沉淀池设计(design of seale pit)将水分离出并使铁皮沉淀的池形构筑物的设计。钢铁厂冶炼出的钢在下一步工序连续铸锭和轧制过程中,都产生大量氧化铁皮(简称铁皮)。采用压力水将铁皮冲入渣沟,流入铁皮沉淀池。经过一段时间,使用抓斗式吊车将池内积存的铁皮提取并卸入铁皮脱水坑内,经脱水后运出。所分离的水流入吸水井并不断抽出,经净化后循环使用。铁皮沉淀池的组成见图1、图2。 设计主要内容包括原始资料收集、型式选择、结构计算要点、结构构造和防护措施。型式选择根据工艺流程,采用平流沉淀时,水池 原始资料收集见冶全厂矿构筑物设计。为矩形(图l)。采用旋流沉淀时,水池为圆形(图2)。 按照场地布置、工程地质情况和施工条件,铁皮沉淀池匡喧瞩{〕瀚彝)退匡里犷熬蒸蒸蒸鬓蒸: 淀池等,都采用地下连续墙方案,工程实践表明,效果 图1平流沉淀池平剖面图良好。 1一、蓄然烹瓷一荷载嘿添淤器粼默黑 面上建筑物传来的外力,计算确定混凝土池壁和底板 :朴.薰:}燃薰馨:薰:一少尸〔…。一亡回一、_一)翼燃翼狱:);〔:;{:: 火一二一/一量轰鬓髻纂璧馨羹霎菜豁簇黔垦票霎翼翼夏努,一{寡… 结构构造铁皮沉淀池通常以混凝土本身的密实l_冲渣沟;2塔薰遐:,;5一泵房;黑嘿翼撬黑蕊蹂黔等级~ 6一单轨吊;7一单轨吊车柱;8一脱水池当采用地下连续墙时,墙壁需设二次浇灌叠合层(开挖后施工)。为使二次浇灌叠合层和地下连续墙结合牢固,一般可在连续墙的墙壁内面上、下、左、右每隔适当距离设置具有一定深度的后钻孔,钻孔呈梅花形布置。二次浇灌前,孔内插入锚筋,用无收缩水泥砂浆灌实,在冲洗干净连续墙面后,再进行叠合层的浇灌。 防护措施为防止清运铁皮时吊车抓斗撞坏铁皮沉淀池的池壁和池底,在池壁、池底的内表面须设置防护措施,例如在大型轧钢车间一般设置P38废钥轨保护,间距300~35omm,在中、小型轧钢车间一般设置P24或P18废钢轨保护,间距3。。mm。防护钢轨要牢固地焊在有足够锚固力的预埋件上,钢轨之间的空隙以二次浇灌混凝土填实,沉淀池内挡板的顶和底部预埋角钢保护。 (翟冠雄顾怡荪)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条