说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 连体现浇梁
1)  cast-in-situ connecting beam
连体现浇梁
2)  cast-in-situ continuous beam
现浇连续梁
1.
In the light of the features of the construction of cast-in-situ continuous beam of passenger dedicated line, and connecting with the construction of Bahe Extra Large Bridge of Zhengxi Passenger Dedicated Line, this paper expounds the key points of quality control of the construction of cast-in-situ continuous beam.
针对客运专线现浇连续梁施工特点,结合郑西客专灞河特大桥的施工,对现浇连续梁质量控制要点进行了阐述。
3)  in-situ concrete continuous and reinforcing box grider
现浇连续箱梁
1.
Discussion on construction technology of in-situ concrete continuous and reinforcing box grider;
浅谈钢筋混凝土现浇连续箱梁的施工技术
4)  continuous box girder which poured in place
现浇连续梁桥
5)  cast-in-situ concrete continuous girder
现浇砼连续箱梁
6)  continuous cast-in-site box girder
连续现浇箱梁
1.
The construction of continuous cast-in-site box girder .
本论文是该桥施工过程的工作总结和研究成果,详细阐述了以下几方面的问题: (1)、连续现浇箱梁满堂支架施工是城市立交桥上部构造的一种普遍形式,能够提高桥梁施工速度,具有占用场地较少、施工技术简单等多种优点。
补充资料:多炉连浇


多炉连浇
sequence casting

duolu}ianjioo多炉连浇(sequenee casting)指在连续铸钢过程中上一次引锭杆可连浇数炉钢水的操作。据统计,5炉连浇与单炉浇铸相比,铸坯产量提高约50%,金属收得率提高约3%,操作费用降低约25%,因此多炉连浇炉数代表了连铸机生产水平。多炉连浇是一项高难技术。它是连铸设备、工艺、管理水平的综合体现。为实现多炉连浇,已开发了一系列技术:(1)采用钢包回转台(见钢包支承装置),实现快速更换钢包(能在1一Zmin完成)。(z)采用大容量中间罐,保证为更换钢包不降低拉速提供充足时间。(3)结晶器在线调宽技术。过去改变钢种和浇注断面必须中断浇注。采用结晶器在线调宽和异钢种连续浇铸技术,可使连浇时间大大延长。据统计,结晶器采用在线调宽,平均连浇9.7炉,而不使用在线调宽仅为5.5炉。(4)快速更换中间罐和更换浸入式水口技术。(5)防止水口堵塞技术。(6)减少连铸机的漏钢事故。由于多炉连浇有明显的经济效益,各类连铸机多炉连浇水平有明显提高。多炉连浇记录不断涌现。如1991年日本水岛厂板坯连铸机连浇927炉(300tLD炉)、34天、一次连浇坯24.8万t。4流方坯连铸机连浇1015炉、38天、一次连浇坯15万t以上。 (马怡绅张永霖)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条